Solar inverter · Tbb Power · CEC approval expired
A 3 kW single-phase solar inverter.
Read from the figures on this page. No review written yet.
The numbers that matter for a home. The full datasheet is below.
Every figure on file for the Tbb Power Apollo Matrix 3.0S, by section.
| Specification | Value |
|---|---|
| Efficiency | |
| Max efficiency | 95% |
| DC input & MPPT | |
| MPPT trackers | 2 |
| Physical | |
| IP rating | IP21 |
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
Get a quote from an installer sourced from the WA (Synergy/Plenti) approved list
Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead. Ask your installer to confirm this inverter’s ESM status.
Estimate for a full-size array on this inverter
At 5 peak sun hours a day (BOM) with a 15% system derate.
The Tbb Power Apollo Matrix 3.0S against the closest-power inverters from other brands.
| Specification | Tbb Power Apollo Matrix 3.0STbb Power | Energizer FORCE 3.0HSEnergizer | Energizer Force 3SEnergizer |
|---|---|---|---|
| Rated power? | 3 kW | 3 kW | 3 kW |
| Max efficiency? | 95.0% | Not on file | Not on file |
| MPPT trackers? | 2 | Not on file | Not on file |
| Phases | Single-phase | Single-phase | Single-phase |
| Type | Solar | Hybrid | Solar |
| Battery ready | No | Yes | No |
| Warranty | 3 years | Not on file | Not on file |
Specs from the CEC register and datasheet enrichment. Indicative: confirm exact figures with your installer.
The Apollo Matrix solar hybrid inverter is covered under a 3-year warranty, where you can claim for defects or performance failures. The warranty excludes non-accredited installations and modifications. To make a claim, contact the customer support service with proof of purchase.
AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.
From the install manual
Showing 15 of 15. The official install manual is the authoritative source — always confirm before acting.
101criticalDC bus is over voltage
102criticalDC bus is under voltage
103criticalHardware protection to prevent DC bus over voltage
104criticalCall your installerAuxiliary power supply is abnormal
107criticalCall your installerSampling is abnormal
109criticalOutput short circuit
112criticalCall your installerBattery is severely under voltage
114criticalInstantaneous over current
115criticalEmergency stop
116criticalCall your installerRelay is abnormal
105warningHeat sink's temperature is too high
106warningTransformer's temperature is too high
110warningOutput over load
111warningCooling system is abnormal
108infoCall your installerROM is abnormal
Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.
About this data
All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.