A battery can be added to an existing home solar system in Perth, and the kind of inverter on the wall sets how it is wired in. Either kind of inverter can work with a battery, though the wiring differs.
To narrow the choice, try the battery matcher.
A hybrid inverter, built to run panels and a battery together, takes the battery directly. A solar-only inverter handles the panels alone, so it stays on the wall and the battery arrives with its own inverter, wired into the home beside it.
Installers call the first route DC coupling and the second AC coupling. The AC route needs a gateway under the WA Battery Scheme, the state's battery rebate program. A gateway is a controller that lets the old solar inverter and the new battery work together.
Our guide to AC and DC coupling compares the two routes for WA homes.
It can. Any new or upgraded solar and battery system has to meet today's grid rules. Adding a battery alters the system, so the solar already on the roof has to meet them too.
This is whole of site compliance. The rules are Western Power's connection requirements and Synergy's DER Functionality Requirements. They include remote management, so Synergy can switch the system off when the grid needs it. Some homes need a part replaced, and some need a new solar system, which is more likely the older the system is.
Wiring is a separate check. A system installed before 2018 may also need its wiring brought up to today's wiring rules, which an electrician looks at on its own. Our guide to adding a battery to existing solar weighs that option against keeping the old system.
A battery added beside an unchanged solar system through its own inverter leaves the old solar exempt from Synergy's remote switch-off rule, though the battery itself must comply. Swapping the solar inverter for a hybrid changes the old system, so it then has to meet the rule.
Yes, but less of it, because the battery fills with spare solar before any is exported (sent to the grid).
Outside a virtual power plant (VPP), the most a home can export depends on remote switch-off: a system Synergy can switch off remotely may export up to a limit set by your network through the Synergy/Western Power connection application (typically 3 kW or 5 kW), and one it cannot is held to 1.5 kW. A battery in Synergy's VPP has its exports managed by Synergy instead.
Only if the battery system has a backup mode, because a solar inverter connected to the grid switches off in a power cut for safety.
Which circuits the backup covers, and whether the panels keep charging the battery during an outage, are questions for the installer to answer in the quote.
A battery installation is VPP compatible when Synergy can enrol it in its virtual power plant (VPP), which draws on home batteries when the grid needs power. Enrolment is separate from remote switch-off, and joining the VPP is a condition of the WA Battery Scheme. Synergy publishes the equipment it approves for this as a list. A battery system needs an inverter with a battery-storage (DER-Storage) listing on Synergy's Supported Solutions List to be eligible for the WA Battery Scheme. Other scheme conditions apply.
The matcher asks about your goal, postcode and daily usage, then shows the batteries that fit and a member installer who covers your area.