Loading Solar Battery Perth...
Loading Solar Battery Perth...
Hybrid inverter · Redback Operations Pty Ltd · SH series · CEC approved September 2026
A 6 kW single-phase hybrid inverter that is battery-ready.
Read from the figures on this page — no review written yet
The numbers that matter for a home. The full datasheet is below.
Rated power
How much solar it can turn into usable power at once
Max efficiency
How much of the solar you make reaches the house
Phases
Runs on a standard single-phase supply
MPPT trackers
2 roof faces can be tuned independently
Type
Runs solar and a battery from one unit
Warranty
How long Redback Operations Pty Ltd stands behind it
Every figure on file for the Redback Operations Pty Ltd SH6000-G3V2 (AS4777-2 2020), by section.
| Specification | Value |
|---|---|
| Efficiency | |
| Max efficiency | 97.5% |
| European efficiency | 96.2% |
| DC input & MPPT | |
| MPPT trackers | 2 |
| Physical | |
| Dimensions (H×W×D) | 363 × 540 × 1270 mm |
| Weight | 63 kg |
| IP rating | IP66 |
| Installation requirements | |
| Top clearance | 150 mm |
| Side clearance | 150 mm |
| AC breaker | 30 A |
| Cable gauge | 4 mm² |
| Earthing method | TN-S |
| DNSP pre-approval | Yes |
| Estimated install time | 8 hrs |
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
Battery compatible
Yes
Backup capable
Yes
CEC approved
24 Sept 2026
Approval expiry
24 Sept 2029
Status
Active
Eligible for rebates
Yes
Years in AU Market
10 years
Australian Office
Yes
CEC-Approved Batteries
8
CEC-Approved Panels
0
Category
Mid-Tier
Typical installed, inverter only
$2,100–$3,600
Prices vary by installer, configuration and site complexity. Get exact quotes from installers you choose.
Compare quotes from installers you choose
Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead — ask your installer to confirm this inverter’s ESM status.
Estimate for a full-size array on this inverter
At 5 peak sun hours a day (BOM) with a 15% system derate.
Australian office
Has local presence
Website
redbacktech.comThe Redback Operations Pty Ltd SH6000-G3V2 (AS4777-2 2020) against the closest-power inverters from other brands.
| Specification | Redback Operations Pty Ltd SH6000-G3V2 (AS4777-2 2020)Redback Operations Pty Ltd | ||
|---|---|---|---|
| Rated power? | 6 kW | 6 kW | 6 kW |
| Max efficiency? | 97.5%best value | 0.0% | 0.0% |
| MPPT trackers? | 2 | Not verified | Not verified |
| Phases | Single-phase | Single-phase | Three-phase |
| Type | Hybrid | Hybrid | Hybrid |
| Battery ready | Yes | Yes | Yes |
| Warranty | 10 years | Not verified | Not verified |
Specs from the CEC register and datasheet enrichment. Indicative — confirm exact figures with your installer.
This warranty covers the Redback smart hybrid system for 10 years, excluding damages from non-accredited installs or modifications. Claims can be submitted through customer support.
AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.
From the install manual
Showing 1 of 1. The official install manual is the authoritative source — always confirm before acting.
045criticalCall your installerEarth fault alarm
Part of the Redback Operations Pty Ltd SH series
Compare every Redback Operations Pty Ltd SH variant side by side →
RED-C1-T100AC (AS4777-2 2020)
100 kW · 3φ
RED-C1-T125AC (AS4777-2 2020)
125 kW · 3φ
RED-H3-S05HV (AS4777-2 2020)
4.999 kW · 1φ
RED-H3-S06HV (AS4777-2 2020)
6 kW · 1φ
RED-H3-S08HV (AS4777-2 2020)
8 kW · 1φ
RED-H3-S10HV (AS4777-2 2020)
9.999 kW · 1φ
Other CEC-approved products from Redback Operations Pty Ltd available in Australia.
Get a quote from an installer from our network that covers your area — you choose whether to act on it. No obligation.
About this data
All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.