This page is the starting point for the site questions. Each section gives the short answer, then points to the guide that goes into depth. The process itself, from approval to switch-on, has its own page: what a solar battery installation in Perth involves.
Where can a battery go in a Perth home?
A home battery usually goes on the inside wall of an attached garage, or on a shaded south- or east-facing outside wall. The Australian battery safety standard, AS/NZS 5139, rules out a few places for a lithium battery: a bedroom or living area, a roof space, a wall cavity, and under stairs or a walkway.
In Perth the part most people miss is the heat. A west wall in full afternoon sun is the one to avoid, because a battery that runs hot ages faster and can cut its own output. Our battery placement guide covers the clearances and the Perth climate notes.
Does a home battery need a concrete slab or a wall?
A home battery needs one or the other, and the battery's installation manual says which. Some mount on a wall bracket. A floor-standing battery sits on a level concrete pad that drains well, sized from the manual. If a living area is on the other side of the wall, the mounting and backing can't be a surface that burns, so a timber wall needs a fire-rated board.
A pad is built in layers, and the work can be done before the installer arrives. The guide to preparing the slab shows each layer and its job.
Is my switchboard ready for a battery?
The installer looks at your switchboard during the site visit, before the quote is firmed up. The meter is changed or reprogrammed as part of the job, so the meter panel gets touched too. In an older home that panel matters more than the switchboard itself.
Most asbestos meter panels went in before 1990. Western Power's terms expect a panel that contains asbestos to be replaced before it does its part of the job. If your home is that age, ask for the panel to be looked at on the site visit, so a new panel is in the quote rather than a surprise on the day.
Does single-phase or three-phase power change what I can install?
Single-phase and three-phase homes in Perth share one limit on total inverter size: 30 kVA, battery inverters included. What differs is how much the system may produce at once on each phase. A battery's power is also capped by the inverter it runs through, so the lower of the two ratings is what your home gets.
One more site detail: if power reaches your home by overhead lines, Western Power suggests an electrician checks for voltage rise before the application goes in. Our guide to Western Power's rules for home batteries sets out the phase limits.
Can a battery be added to the solar I already have?
Yes. A battery joins existing solar in one of two ways. A new hybrid inverter can run the panels and the battery together, or a battery inverter can sit beside the one you have. The guide to adding a battery to existing solar compares both.
Can you install a battery in a unit, a strata home or a rental?
Yes, with one extra step. A unit on a shared connection needs consent from the strata body, and Western Power runs a technical assessment on a shared connection before it approves. A unit with its own individual connection skips that assessment.
A rented home needs the landlord's consent. The WA Battery Scheme counts a home that is standalone or unit titled, and owned or rented with that consent. The WA solar battery rebate guide lists the other conditions.
Does living near the coast change a battery install?
Living near the coast changes the paperwork more than the install. Some battery warranties exclude damage from the sea coast or saltwater unless the maker approved the site in writing before the install, and asking at claim time is too late. Salt air also shapes the spot and any enclosure. Our guide to choosing a battery brand shows what to read in a warranty before you sign.
Is it easier to put a battery in a new build?
Usually, yes. In a new build, the electrician can run the battery cabling and leave room in the switchboard before the plasterboard goes up. The builder can fit a fire-rated board where the battery goes. In an existing home those jobs happen after the fact. The new build scenario walks through the timing stage by stage.
Who approves a battery install, and what happens after it?
Western Power approves a battery's connection to the grid before it is switched on, and some councils ask for their own approval as well. On the day the power is off while the battery goes in. Afterwards the meter work and the switch-on finish the job.
The buyer's guide sets out each step in order and the papers to keep. Once the battery is on the wall, our home battery safety guide covers the upkeep and the shutdown steps.
Who can install a home battery in WA?
In WA a home battery is installed by a licensed electrical contractor. An installer accredited by Solar Accreditation Australia (SAA) has to be on site for the set-up, a check part-way through and the testing. That accreditation belongs to the person, not the company. Our guide on how to choose a solar installer in Perth lists the questions to ask before you sign.
Solar Battery Perth's battery library holds 3,665 battery listings from the Clean Energy Council's approved list, at our 17 November 2026 refresh. Each one shows the model's size and chemistry, which helps when you are matching a battery to the spot.
Questions people ask
How do I get my home ready for installation day?
Clear a path to the switchboard and to the spot where the battery goes, and keep pets out of the way. Have your Wi-Fi password handy for the monitoring set-up. Charge your phone and laptop first, because the power is off while the battery goes in.
Does a home battery need an internet connection?
It helps. Once the system is registered, Synergy can manage how much the home sends to the grid over the internet. Without a steady internet link, exports are held to 1.5 kW.
Do I need council approval for a home battery?
Some councils ask for their own approval. Western Power's approval to connect is the one every grid-connected home needs. Your installer or the council can tell you whether your council has its own step.
How long does a battery installation take from start to finish?
Synergy says to allow up to three months from accepting a quote to a working battery. Stock, the Western Power approval and the installer's calendar set the pace. The day on site is a small part of that.
About this guide. Solar Battery Perth is a Perth library of solar and battery information. Our editorial team writes these guides from the Clean Energy Council product list, Synergy's published scheme rules and the WA Government's guidance, and dates every page when it changes.
What should you do next?
Before any installer visits, walk around your home and note three things: the shaded wall nearest the switchboard, the age of the meter panel, and whether power comes in by overhead line. Those three answers shape the quote more than the battery does. Then use the form below to line up batteries and installers for your home.
