This is an illustrative scenario built on typical Perth construction timelines and energy patterns, not a specific customer story.
Building new is the simplest time to add solar and a battery. A few things work in your favour:
Roof design: At the design stage, the roof can be pitched and laid out for the sun. In Perth a north-facing roof catches the most. A split north/west roof spreads generation into the afternoon, which helps fill the battery before the evening.
First-fix wiring: The electrician can run battery conduit, switchboard capacity and backup circuit wiring at first fix, before the plasterboard goes up. That avoids the surface-mounted or chased cable runs a retrofit can need. Pre-wiring for a second battery is worth raising even if you only fit one at first.
Switchboard sizing: A new switchboard can be specified with room for the battery inverter, a backup transfer switch and an EV charger circuit. Upgrading a full switchboard later is a separate job with its own cost.
Garage wall preparation: The builder can fit a fire-rated backing board (Hebel or fibre-cement) behind the battery spot during construction, meeting AS/NZS 5139 without bringing another trade back later.
The build itself sets the decision points:
Slab stage: Confirm the panel layout with your electrical designer. This is when the conduit runs from the roof to the switchboard and battery spot are planned.
Frame stage: First-fix wiring happens now. Battery conduit, backup circuit wiring and switchboard size are locked in. Changes after plasterboard cost more.
Lock-up stage: The battery can go in once the garage is closed in. Many builders line up the solar and battery install with the final electrical fit-out.
Practical completion: The system is commissioned, Western Power is notified and monitoring is connected. The battery starts working from your first night in the house.
Rebate timing: STCs are set by the installation date, not the purchase or contract date. The battery STC factor steps down every six months, on 1 January and 1 July, so if your build spans one of those dates, an install before it gets the higher rate. Talk about this timing with your builder and installer early.
New-build buyers often roll solar and the battery into the construction loan. A battery costs about $7,000–$9,000 for 10 kWh and $10,000–$15,000 for 20 kWh before rebates (estimate, Oct 2026), and a 10 kW solar system adds about $7,000–$13,000 (already net of its own STCs). After the WA rebate ($1,300 for 10 kWh) and the battery's federal STCs (about $2,700 for 10 kWh and $4,700 for 20 kWh at today's rate), the battery's net cost drops to roughly $3,000–$5,000 for 10 kWh or $4,000–$9,000 for 20 kWh.
Over a 30-year mortgage, the battery adds to the repayments. Whether the savings cover that depends on the amount financed, the rate, the term, your tariff, exports, battery size and load shape. Compare the finance against a calculator result before treating it as cash-flow positive from day one.
Size a battery to your evening and overnight use, step by step, with summer cooling in mind.
AS/NZS 5139 clearance rules, garage vs outdoor walls, and what installers check on-site.
Synergy customers get $130/kWh back, capped at $1,300.