Skip to main content
Solar Battery PerthSolar Battery Perth
  • Library
  • Compare
  • Calculate savings
  • Quote
  • Tools
Battery matcher
Battery matcher

Rebate and policy updates by email

What's changing with WA rebates and battery rules, for Perth homeowners.

Solar Battery Perth

WA-specific solar and battery tools with transparent installer matching for Synergy and Western Power customers.

  • 08 9429 8803
  • info@solarbatteryperth.com.au
Explore your optionsCompare products

Tools

  • Solar system quiz
  • Side-by-side comparison
  • Savings calculator
  • Tariff comparison
  • VPP earnings
  • Quote evaluator
  • Warranty comparison
  • Library
  • Product search
  • All tools

Information

  • How it works
  • Resources
  • WA rebates & incentives
  • Battery price index
  • Synergy tariffs
  • Financing
  • Getting started
  • Buyer's guide
  • Solar and battery integration
  • Battery scenarios

Get started

  • Find installers
  • Perth suburbs
  • Brands
  • Contact us
  • Common questions
Privacy policyTerms of useDisclaimerReview policyAffiliate disclosureAccessibility

© 2026 Solar Battery Perth, operated by WattMate Pty Ltd. Independent solar and battery resource for WA homeowners.

Installers pay us a flat $30 including GST per accepted lead, the same for every installer and every system. How it works

45 Ventnor Avenue, West Perth WA 6005

  • Home
  • Library
  • Compare
  • Savings
  • Quote
  1. Home
  2. Inverters
  3. GoodWe
  4. GW125K-PCS-N-G11

Battery inverter · GoodWe · CEC approved April 2026

GoodWe GW125K-PCS-N-G11

CEC listing: GW125K-PCS-N-G11 (AS4777-2 2020)

A 125 kW three-phase battery inverter.

Rated power
125kWHow much solar it can run at once: a large roof
Battery-ready
YesBattery inverter: it runs the battery, alongside your solar inverter

Commercial-scale inverter

At 125 kW, this is built for businesses and large sites. A typical home inverter is 5–10 kW.

Browse home-size inverters →
Datasheet (PDF)

Get this inverter quoted in Perth

Enter your postcode and get a free, no-obligation quote from a member installer who covers your area.

What we can tell you

Read from the figures on this page. No review written yet.

  • It is a battery inverter: it runs a battery, and pairs with a separate solar inverter.
  • It needs a three-phase supply, so check your switchboard or ask your installer.
  • It is CEC-approved, which a new install needs to qualify for STCs.

Key specs, in plain terms

The numbers that matter for a home. The full datasheet is below.

Rated power
125kW
How much solar it can turn into usable power at once
Max efficiency
98.6%
How much of the solar you make reaches the house
Phases
3-phase
Needs a three-phase supply, so check your switchboard
Type
Battery
Runs a battery; pairs with a separate solar inverter
Warranty
5yr
How long GoodWe Technologies Co Ltd stands behind it

Full datasheet

Every figure on file for the GoodWe GW125K-PCS-N-G11, by section.

Full datasheet, by section
SpecificationValue
Efficiency
Max efficiency98.6%
European efficiency98.3%
Physical
IP ratingIP66
Installation requirements
Top clearance600 mm
Side clearance100 mm
AC breaker250 A
Cable gauge240 mm²
Earthing methodTN-S
DNSP pre-approvalNo
Estimated install time12 hrs

Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.

Features and CEC approval

Battery compatible
Yes
Backup capable
Yes
CEC approved
30 Apr 2026
Approval expiry
30 Apr 2029
Status
Active
Listed for STCs
Yes

About GoodWe

Years on the CEC list
12 years
Australian office
Yes
Category
Mid-Tier
CEC-approved inverters
229
CEC-approved batteries
30
CEC-approved panels
168
View full profile →
Explore your options

Get a quote from an installer sourced from the WA (Synergy/Plenti) approved list

  • Compare with other inverters→
  • Already have a quote? Check it→
  • GoodWe Technologies Co Ltd batteries and panels→

WA compliance

ESM compliant
Check

Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead. Ask your installer to confirm this inverter’s ESM status.

Australian office

Has local presence

Website

www.goodwe.com.au
12 years on the CEC list

How it compares

The GoodWe GW125K-PCS-N-G11 against the closest-power inverters from other brands.

Specification
GoodWe GW125K-PCS-N-G11GoodWe
Delta AIOA279K125LDelta
Delta AIOC279K125LDelta
Rated power?125 kW125 kW125 kW
Max efficiency?98.6%Not on fileNot on file
MPPT trackers?Not on fileNot on fileNot on file
PhasesThree-phaseThree-phaseThree-phase
TypeBatteryBatteryHybrid
Battery readyYesYesYes
Warranty5 yearsNot on fileNot on file

Specs from the CEC register and datasheet enrichment. Indicative: confirm exact figures with your installer.

Documents

  • DatasheetPDF, opens in a new tab
  • Warranty termsPDF, opens in a new tab
  • Installation guide and user manualPDF, opens in a new tab
  • Compliance certificatePDF, opens in a new tab

5-year inverter warranty

GoodWe GW125K-PCS-N-G11

GOODWE offers a 5-year limited warranty covering manufacturing defects. Key exclusions include improper installation and environmental damage. Claims can be made via the local distributor or online ticket system.

AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.

Coverage shape
Full-replacement coverage
If you sell the home
Does not transfer with the home
What voids it
Non-accredited installation, modifications, tampering, improper handling, normal wear and tear, defects from unforeseen circumstances.
Environment limits
Defects caused by exposure to sea coasts/saltwater or other aggressive atmospheres without GOODWE’s written approval.
Read the official warranty document (PDF)

Fault & error codes — GoodWe GW125K-PCS-N-G11

From the install manual

32 documented

Showing 32 of 32. The official install manual is the authoritative source — always confirm before acting.

  • CPLD ErrorcriticalCall your installer
    Manual (PDF)

    CPLD internal error

    Likely cause
    Temporary environmental issues or internal damage.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • DC-SPDcriticalCall your installer
    Manual (PDF)

    Lightning strike protection activation

    Likely cause
    The inverter is struck by lightning.
    What to do
    Disconnect the AC output switch and DC input switch, then reconnect after 5 minutes. Contact dealer if the issue persists.
  • EEPROM FailcriticalCall your installer
    Manual (PDF)

    Failure of the internal EEPROM memory

    Likely cause
    The internal memory Flash is abnormal.
    What to do
    Disconnect the AC output switch and DC input switch, then reconnect after 5 minutes. Contact dealer if the issue persists.
  • FAC FailcriticalCall your installer
    Manual (PDF)

    Utility grid frequency error

    Likely cause
    The utility grid frequency is outside the allowed range.
    What to do
    Check if the grid frequency is normal; contact the local power company if out of range. Contact dealer if issue persists.
  • Night BUS FaultcriticalCall your installer
    Manual (PDF)

    AC side fault during nighttime

    Likely cause
    Utility grid power fails or AC cable issues.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • Night DCSPS FaultcriticalCall your installer
    Manual (PDF)

    Nighttime protective measure failure

    Likely cause
    Temporary abnormality or internal inverter damage.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • PV Reverse FaultcriticalCall your installer
    Manual (PDF)

    PV string connected incorrectly

    Likely cause
    PV strings are connected reversely.
    What to do
    Check PV string connections to ensure proper polarity.
  • Relay FailcriticalCall your installer
    Manual (PDF)

    Relay malfunction

    Likely cause
    Relay is damaged or there’s a control circuit issue.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • SPI Comm FailcriticalCall your installer
    Manual (PDF)

    Communication failure with the SPI chip

    Likely cause
    The chip is not powered on or the program version is wrong.
    What to do
    Disconnect the AC output switch and DC input switch, then reconnect after 5 minutes. Contact dealer if the issue persists.
  • AC HCT FailwarningCall your installer
    Manual (PDF)

    AC current sensor error

    Likely cause
    Abnormal HCT sensor sampling.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • AFCI FaultwarningCall your installer
    Manual (PDF)

    Arc Fault Detection

    Likely cause
    Loose PV string terminal or broken DC cables.
    What to do
    Check wiring of PV modules to ensure correct connections.
  • BUS-start FailwarningCall your installer
    Manual (PDF)

    Failed starting operation

    Likely cause
    Inadequate power from the PV string or control circuit problems.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • DCI HighwarningCall your installer
    Manual (PDF)

    Detected high DC currents

    Likely cause
    DC input current exceeds normal range.
    What to do
    Contact dealer or after-sales service.
  • ExFan FailurewarningCall your installer
    Manual (PDF)

    Fan failure

    Likely cause
    Fan supply or mechanical issue, aging or damage.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • GFCI Chk FailwarningCall your installer
    Manual (PDF)

    GFCI failure

    Likely cause
    Sampling error in the GFCI HCT.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • Gnd I FailwarningCall your installer
    Manual (PDF)

    Input insulation resistance failure

    Likely cause
    Decreased insulation resistance during operation.
    What to do
    Ensure that the environment is suitable and grounding is proper.
  • HCT Chk FailwarningCall your installer
    Manual (PDF)

    AC sampling error

    Likely cause
    Abnormal sampling of AC sensor.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • InFan FailwarningCall your installer
    Manual (PDF)

    Internal fan failure

    Likely cause
    Fan supply or mechanical issues.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • ISO FailwarningCall your installer
    Manual (PDF)

    Insulation failure

    Likely cause
    Short circuit to the ground or improper grounding.
    What to do
    Verify PV input cables and grounding connections.
  • Model ErrorwarningCall your installer
    Manual (PDF)

    Model verification failure

    Likely cause
    Temporary abnormality or internal damage.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • Over TemperaturewarningCall your installer
    Manual (PDF)

    Inverter overheating

    Likely cause
    Poor ventilation, high ambient temperature, or fan issues.
    What to do
    Check ventilation and environment; improve if necessary. Contact dealer if issues persist.
  • PID ErrorwarningCall your installer
    Manual (PDF)

    PID module error

    Likely cause
    Abnormal ground or PID module issues.
    What to do
    Check DC and AC wirings; contact dealer if persists.
  • PV HCT FailwarningCall your installer
    Manual (PDF)

    PV sensor failure

    Likely cause
    Temporary environmental causes or internal errors.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • PV Over CurrwarningCall your installer
    Manual (PDF)

    Continuous overcurrent detected from PV

    Likely cause
    Improper module configuration or hardware issues.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • PV Over VoltagewarningCall your installer
    Manual (PDF)

    Input voltage exceeds limits

    Likely cause
    Too many PV modules in series.
    What to do
    Verify PV string input voltage; check if it meets specs.
  • PV Short FailurewarningCall your installer
    Manual (PDF)

    Hardware short circuit

    Likely cause
    Internal hardware failure.
    What to do
    Contact dealer or after-sales service.
  • PV Voltage LowwarningCall your installer
    Manual (PDF)

    Low voltage detected

    Likely cause
    Inadequate sunlight or abnormal behavior.
    What to do
    Ensure sufficient sunlight; contact dealer if frequent.
  • Ref-V Chek FailwarningCall your installer
    Manual (PDF)

    Reference circuit failure

    Likely cause
    Abnormal reference circuit.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • Relay FaultwarningCall your installer
    Manual (PDF)

    Relay error or short circuit

    Likely cause
    An issue with the relay or sampling circuit.
    What to do
    Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • SPD FailwarningCall your installer
    Manual (PDF)

    Lightning protection failure

    Likely cause
    Possible lightning strike to the inverter.
    What to do
    Improve lightning protection measures. Disconnect AC and DC switches, reconnect after 5 minutes. Contact dealer if persists.
  • Utility LosswarningCall your installer
    Manual (PDF)

    Loss of utility supply

    Likely cause
    Utility grid power failure or cable disconnection.
    What to do
    Check AC connections; alarm clears automatically when power restores.
  • Vac FailurewarningCall your installer
    Manual (PDF)

    Utility grid voltage error

    Likely cause
    Grid voltage does not meet requirements.
    What to do
    Check AC output voltage, ensure phase sequence and proper connections.

More GoodWe Technologies Co Ltd inverters

GW125K-GT (AS4777-2 2020)

125 kW · 3φ

GW125K-PCS-N-G10 (AS4777-2 2020)

125 kW · 3φ

GW120K-HT (AS4777-2 2020)

120 kW · 3φ

GW110K-GT (AS4777-2 2020)

110 kW · 3φ

GW110K-HT (AS4777-2 2020)

110 kW · 3φ

GW100K-ET-G10 (AS4777-2 2020)

100 kW · 3φ

View all GoodWe Technologies Co Ltd inverters

More from GoodWe

Other CEC-approved products from GoodWe available in Australia.

GoodWe Batteries

GW100KWH-D-10

100.8 kWh · LFP

GW102.4-BAT-AC-G10

100 kWh · LFP

GW112.6-BAT-AC-G10

110 kWh · LFP

GW5.1-BAT-D-G20

5 kWh · LFP

GW5.1-BAT-D-G21

5 kWh · LFP

GW6.0-BAT-D-G20

5.9 kWh · LFP

View all GoodWe batteries

GoodWe Solar Panels

BMM-T3/108A(505W)

505W

BMM-T3/108A(510W)

510W

BMM-T3/108A(515W)

515W

BMM-T3/120A(565W)

565W

BMM-T3/120A(570W)

570W

BMM-T3/120A(575W)

575W

View all GoodWe panels
View full GoodWe manufacturer profile

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

Or explore your battery options first →

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

About this data

All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.

Explore your optionsCompare inverters
Spotted something outdated?