From 1 May 2026, new and upgraded solar and battery systems on Western Power's network follow new rules. A home can now install up to 30 kVA of inverter capacity. In return, each system either accepts remote management or takes a fixed 1.5 kW export cap. Systems put in before then don't need to change.
The rules sit in Western Power's WEM Procedure: Technical Requirements for Standard Small User Facilities.
Yes. A site without good internet, or whose owner prefers it, can take the fixed 1.5 kW export limit instead. Your own use of the system is the same. The trade-off is that a fixed-export site misses out on DEBS export credits, VPPs and Synergy Battery Rewards. An older system can also opt in to the new rules later.
Emergency solar management (ESM) applies to systems of 5 kVA or less. It lets solar be switched off remotely in a rare grid emergency, and it does not switch off your home. Our ESM guide covers how an event works.
What ESM means for your system, how a switch-off event works and how Synergy tests it
The steps to connect a solar and battery system to the Western Power network, and the paperwork each one needs
How export limits work on the Western Power network, and what a battery changes about the power you send out
How the Western Power network runs and what it means for a solar battery install
The news write-up of the change, with its rebate side, is the new WA connection rules from May 2026.