Loading Solar Battery Perth...
Loading Solar Battery Perth...
A battery and an inverter work together when four checks line up: both the battery and the inverter appear on the approved lists that apply to them, the brand confirms the pairing, the inverter is listed on the Synergy Supported Solutions List (SSL) in the Synergy area, and the household is enrolled in a qualifying Virtual Power Plant (VPP) product. Miss any one of these and you can end up with hardware that runs but is locked out of a scheme, or a pairing the manufacturer will not warrant.
Run the four checks below before you sign a quote. They take minutes and they catch the mismatches that cost the most to unwind later.
The SSL is Western Australia's official register of inverters and VPP-capable batteries approved for connecting to the Synergy network. It is one of the gates for the state's battery programs: the rebate, the Battery Rewards VPP, and the interest-free loan all require both the inverter and the battery to be listed, on top of the mandatory VPP enrolment. The rebate itself is worth $130 per kWh of usable capacity, capped at $1,300.
Check both the inverter and the battery against the current SSL, confirm the brand approves that specific pairing, and confirm which VPP product the install will enrol you in.
For the full list of what qualifies and how the scheme fits together, see the Synergy approved products (SSL) guide.
Adding a battery to an existing solar system is where compatibility gets simpler. An AC-coupled battery brings its own inverter, so it sidesteps the hybrid-pairing question with your current solar inverter: the two do not have to be a matched set. What it does not sidestep is the battery's own inverter. Backup capability and power limits depend on that unit, not on your original solar inverter, so a retrofit still turns on which battery-inverter you choose.
The trade-off between adding an AC-coupled battery and replacing your inverter with a hybrid is a decision in itself. The AC vs DC coupled batteries comparison walks through which suits a retrofit and which suits a new build.
Ask the installer for the exact model codes on both the battery and the inverter, then confirm four things: the inverter and the battery are both on the current SSL, the brand lists the two as a tested pairing with the firmware each requires, and you know which VPP product you'll be enrolled in. Model codes, firmware, and VPP offerings move, so a pairing that was valid last year can shift with an update. If a quote names a battery brand but is vague on the inverter or the VPP enrolment, that is the gap to close before you commit.
If you are still choosing hardware rather than checking a quote, the battery brand comparison and the budget vs premium breakdown help you shortlist inverters and batteries that are known to pair.
Compare quotes from Perth installers you choose and each one will quote a compatible, SSL-listed system for your setup. Prefer to narrow the hardware first? Compare inverters side by side.
Compare quotes from SAA-accredited local installers — you choose which to act on. No obligation, no pressure.
Two modular systems Perth buyers often shortlist together, compared spec by spec.
Retrofit vs new install, efficiency trade-offs, and which brands use each type.
A 10 kWh usable LFP tower that stacks in 5 kWh modules, with a 10-year warranty.
Not sold here and not on the approved-product register, so it earns no rebate.
Answer a few questions and see systems and installers that fit your home.