For a new install or an inverter replacement, a hybrid inverter with a DC-coupled battery is the modern default. An AC-coupled battery is the route for adding storage to a system you want to keep, and in WA that route comes with conditions.
Specifications and eligibility change. Always confirm current details with your installer.
The difference is where the battery connects:
Which one suits you comes down to whether you are starting fresh or building on an existing system, and whether that system is worth building around. Want the mechanics and the WA rules in more depth? Read our guide to AC-coupled batteries in WA.
If you are installing solar and a battery together, or your inverter needs replacing, a hybrid inverter with a DC-coupled battery is the modern default.
A hybrid inverter can charge the battery on the DC side while it powers the home or exports on the AC side, so one sunny hour can do both jobs.
Without a battery, the accreditation rules limit the array to about 133% of the inverter's AC rating. With a battery connected, the current rules allow a larger array, up to the inverter maker's limit, which varies by model: some 5 kW hybrids accept 10 kW of panels, others well under 7.5 kW. Output above the AC rating can charge the battery instead of being clipped. Your installer confirms the limit for the model in your quote.
DEBS export payments depend on inverter capacity: the solar inverter must be 5 kW or less. That is one reason a 5 kW hybrid with a battery is a common WA design. The inverter stays within the DEBS limit while the battery takes the daytime output the house does not use.
Solar reaches the battery as DC without a trip through AC and back, so less is lost along the way.
Solar and battery share one inverter, which counts once toward WA's 30 kVA aggregate inverter limit. If an existing solar inverter stays on site alongside a new hybrid, both count.
An AC-coupled battery has its own inverter and sits on the AC side of the solar inverter you already have. Its real use case is adding a battery to an existing system you want to keep. In WA that route comes with conditions:
New install, or your inverter needs replacing
One hybrid inverter runs the panels and the battery, charges on the DC side while it exports, and leaves room to size the array above the inverter's rating within the rules.
Your installer confirms what your site allows.
Existing system that is recent and compliant, with no expansion planned
Keeping a recent, compliant inverter can make sense when nothing more is planned. Ask for an AC-coupled quote that names the gateway device or shared-compliance pairing, and a hybrid replacement quote, then compare them over the life of the system.
Your installer confirms what your site allows.
Existing system that is ageing, or that you plan to expand
Adding to an AC-coupled system can trigger whole-of-site compliance, so a system you expect to grow often makes sense to rebuild around a hybrid now. For many existing systems the sound path is replacing toward a DC-coupled / hybrid-inverter setup rather than expanding an AC-coupled one, avoiding future compliance limitations.
Your installer confirms what your site allows.
Modular storage that pairs with Sigenergy's own hybrid inverters.
Synergy's Supported Solutions List lists 3 Sigenergy products for the WA battery scheme (October 2026 list). Eligibility follows the exact inverter or system in your quote.
High-voltage modular battery for Sungrow hybrid inverters.
Synergy's Supported Solutions List lists 3 Sungrow products for the WA battery scheme (October 2026 list). Eligibility follows the exact inverter or system in your quote.
A range that includes hybrid all-in-one units. Confirm which SMILE model your quote names, and how it connects.
Synergy's Supported Solutions List lists 9 Alpha ESS products for the WA battery scheme (October 2026 list). Eligibility follows the exact inverter or system in your quote.
Modular LFP battery that pairs with a compatible hybrid inverter from another brand.
Rebate eligibility rests on the hybrid inverter it is paired with, which needs to be listed on Synergy's Supported Solutions List for the WA battery scheme.
High-voltage battery for compatible hybrid inverters.
Rebate eligibility rests on the hybrid inverter it is paired with, which needs to be listed on Synergy's Supported Solutions List for the WA battery scheme.
Modular battery with built-in microinverters, installed on the AC side.
Synergy's Supported Solutions List lists no Enphase product for the WA battery scheme (October 2026 list).
Battery with a built-in solar inverter. Added to an existing system it sits on the AC side. Tesla Powerwall 3 is not eligible for the WA Battery Scheme, Synergy Battery Rewards or the interest-free loan.
Every conversion between DC and AC loses a little energy. In an AC-coupled system, solar is converted to AC by the solar inverter, back to DC to charge the battery, and to AC again when the battery discharges. In a hybrid system, solar charges the battery as DC and is converted once, on the way out.
How much that matters depends on the specific equipment, so compare the listed round-trip efficiency of the models you are quoted rather than a rule of thumb. For most homes it is a smaller factor than choosing the right path and sizing the system well.
WA's connection rules from 1 May 2026 apply to both coupling types, but they land differently on each.
Rebate and VPP eligibility: for the WA battery rebate, Synergy Battery Rewards and the interest-free loan, the inverter or gateway in your quote needs to be listed on Synergy's Supported Solutions List for the WA battery scheme. A solar-only string inverter on the list is there for export, not for a battery. Tesla Powerwall 3 is not eligible for the WA Battery Scheme, Synergy Battery Rewards or the interest-free loan.
Gateway devices in practice, the expansion rule, and when replacing your inverter makes more sense than keeping it are covered in more depth in our guide to AC-coupled batteries in WA. Always confirm current requirements with your installer and Western Power.
Our battery matcher takes your home and existing setup into account and suggests batteries that suit it.
Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.
Architecture settled? The desk indexes every CEC-approved model in solar batteries for Perth.
Two modular systems Perth buyers often shortlist together, compared spec by spec.
A 10 kWh usable LFP tower that stacks in 5 kWh modules, with a 10-year warranty.
The two all-in-one towers on Synergy's list, compared on backup, warranty terms and EV charging.
See annual savings and payback for your system, on current Synergy rates and WA rebates.
On sale here, but not on the approved-product register, so it earns no rebate.
Answer a few questions and see systems and installers that fit your home.