DMEGC · manufacturer profile

DMEGC

Solar panel manufacturer

On the CEC list
4yrsSince 2022
Current CEC listings
123Batteries, inverters and panels
Safety notices
0None on our record

Specifications and pricing change. Confirm them with the manufacturer.

Quick answer

DMEGC has 8 battery models, 7 inverters and 135 panels listed on the CEC register, and has been on the CEC list since 2022. It may have been in Australia earlier.

Sources: CEC register

About DMEGC

Parent: Hengdian Group

1980

Founded

2017

AU entry

DMEGC (Hengdian Group DMEGC Magnetics) is a large Chinese industrial conglomerate that expanded into solar panel manufacturing.

In Australia, DMEGC panels are distributed through solar wholesalers and used in residential and commercial installations. Their panels offer competitive specifications backed by the manufacturing scale of a major industrial group.

Verify local warranty support availability with your installer.

SZSE:002056ISO 9001ISO 14001
Are you DMEGC?
Manufacturer portal

We welcome manufacturers to help keep their profile accurate and up to date.

Everything DMEGC has on the CEC register

Each product type at a glance. The full lists, grouped by series, are below.

DMEGC full lists, by product type

Pick a type to open its full list, grouped by series.

Trust and support

What we have verified about DMEGC in Australia, and what we haven't.

Australian office
Not verified
Not verified
AU support
61498353593 · xin.wang@dmegc.com.cn
Listed
Local support
Yes, support handled through Australian channelsSource: Australian warranty, checked 14 Oct 2026
Confirmed
Local warranty claims
Australian contact on record. Confirm the claim process with your installer
Listed
CEC listings
123 approved right now · 27 delisted · listed since 2022
Approved
Certifications
ISO 9001 · ISO 14001
Research-verified
Listed company
SZSE:002056
Parent company
Hengdian Group
AU distributor
DMEGC Renewable Energy Australia Pty Ltd
Country of origin
CN
Documents

Market timeline

DMEGC has been on the CEC list since 2022. It may have been in Australia earlier. Here is what has happened on the CEC register since then.

On the CEC list
4yrsSince 2022
Approved right now
1238 batteries · 7 inverters · 108 panels
Delisted
27Of 150 ever listed
Safety notices
0None on our record

Events on the register, by year

  • Approval or launch
  • Safety
  • Other

Each block is one register event. Tap a year to see its events in the list below.

Key moments

6 of 13 events
  1. 2022

    First CEC Approval

    Received initial Clean Energy Council certification.

    Approval
  2. 2022

    ☀️ First CEC-Approved Solar Panel

    DMEGC entered Australian panel market with DM365M6-60HBB.

    Approval
  3. 2024

    ☀️ 50 Panel Models Listed

    Panel range expanded to 50 CEC-approved models.

    Approval
  4. 2025

    ☀️ 100 Panel Models Listed

    Panel range expanded to 100 CEC-approved models.

    Approval
  5. 2025

    🔋 First CEC-Approved Battery

    DMEGC entered the Australian battery market with H02-10.

    Approval
  6. 2026

    ⚡ First CEC-Approved Inverter

    DMEGC entered Australian inverter market with DM-INV-SPH3.6K (AS4777-2 2020).

    Approval

Frequently asked questions

About DMEGC

Where is DMEGC based?

DMEGC is headquartered in Dongyang, China and was founded in 1980. Its products are sold in Australia through SAA-accredited installers.

Is DMEGC available in Perth and WA?

Yes. DMEGC entered the Australian market in 2017, and its products are installed across Perth and Western Australia by SAA-accredited installers. Confirm local support and warranty handling with your installer before you buy.

Are DMEGC products CEC approved?

DMEGC has held Clean Energy Council approved-product listings since 2017. CEC approval is a baseline safety and quality check, and rebates are only paid on approved products.

Batteries

Is a DMEGC battery eligible for the WA Residential Battery Scheme?

WA's rebate ($130/kWh, up to $1,300) depends on whether the system pairs with an inverter listed for battery storage on Synergy's list. Eligibility is set by the inverter, not the battery brand. Whether a given DMEGC system qualifies depends on the inverter it's installed with, so confirm the pairing with your installer.

How many DMEGC batteries can I compare on Solar Battery Perth?

Solar Battery Perth lists 8 CEC-approved DMEGC battery models with specs, indicative pricing and warranty detail. Compare them against other brands to find the best fit for your Perth home.

Inverters

What DMEGC inverters are on the CEC register?

DMEGC has 7 CEC-approved inverter models from 3.6-10 kW (single and three phase). Compare them against other brands by size, phase and battery compatibility.

Can a DMEGC inverter run a home battery?

7 of DMEGC's 7 inverter models are hybrid inverters, which connect a home battery directly. Confirm which batteries each model supports with your installer.

Panels

What DMEGC solar panels are on the CEC register?

DMEGC has 108 CEC-approved panel models from 255-735 W.

Where next

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

Product Information Disclaimer:

Product specifications, pricing, and availability are subject to change without notice. We make no warranties regarding product performance, longevity, or suitability for your specific needs.

Always verify specifications with the manufacturer and installer before purchase. Warranty terms are set by manufacturers and may have conditions not disclosed here. Battery performance degrades over time.