Skip to main content
Solar Battery PerthSolar Battery Perth
  • Library
  • Compare
  • Calculate savings
  • Quote
  • Tools
Battery matcher
Battery matcher

Rebate and policy updates by email

What's changing with WA rebates and battery rules, for Perth homeowners.

Solar Battery Perth

WA-specific solar and battery tools with transparent installer matching for Synergy and Western Power customers.

  • 08 9429 8803
  • info@solarbatteryperth.com.au
Explore your optionsCompare products

Tools

  • Solar system quiz
  • Side-by-side comparison
  • Savings calculator
  • Tariff comparison
  • VPP earnings
  • Quote evaluator
  • Warranty comparison
  • Library
  • Product search
  • All tools

Information

  • How it works
  • Resources
  • WA rebates & incentives
  • Battery price index
  • Synergy tariffs
  • Financing
  • Getting started
  • Buyer's guide
  • Solar and battery integration
  • Battery scenarios

Get started

  • Find installers
  • Perth suburbs
  • Brands
  • Contact us
  • Common questions
Privacy policyTerms of useDisclaimerReview policyAffiliate disclosureAccessibility

© 2026 Solar Battery Perth, operated by WattMate Pty Ltd. Independent solar and battery resource for WA homeowners.

Installers pay us a flat $30 including GST per accepted lead, the same for every installer and every system. How it works

45 Ventnor Avenue, West Perth WA 6005

  • Home
  • Library
  • Compare
  • Savings
  • Quote
  1. Home
  2. Inverters
  3. Ningbo Sunways Technologies
  4. STS-5KTL-NS

Solar inverter · Ningbo Sunways Technologies · CEC approved September 2026

Ningbo Sunways Technologies STS-5KTL-NS

CEC listing: STS-5KTL-NS (AS4777-2 2020)

A 5 kW single-phase solar inverter.

Rated power
5kWHow much solar it can run at once
Battery-ready
NoSolar-only: a battery later means a hybrid swap or a second inverter
Datasheet (PDF)

Get this inverter quoted in Perth

Enter your postcode and get a free, no-obligation quote from a member installer who covers your area.

STS-5KTL-NS: the short answer

Feed-in credits (DEBS)DEBS pays for exports only when the inverter is 5 kW or less
YesDEBS pays for exports only when the inverter is 5 kW or less

What we can tell you

Read from the figures on this page. No review written yet.

  • It is a solar-only inverter: adding a battery later means replacing it with a hybrid inverter, or keeping it and adding an AC-coupled battery, which in WA counts as an alteration with whole-of-site compliance.
  • It runs on a standard single-phase supply.
  • It is CEC-approved, which a new install needs to qualify for STCs.

Key specs, in plain terms

The numbers that matter for a home. The full datasheet is below.

Rated power
5kW
How much solar it can turn into usable power at once
Max efficiency
98.1%
How much of the solar you make reaches the house
Phases
Single
Runs on a standard single-phase supply
Type
Solar
Runs solar only
Warranty
10yr
How long Ningbo Sunways Technologies Co Ltd stands behind it

Full datasheet

Every figure on file for the Ningbo Sunways Technologies STS-5KTL-NS, by section.

Full datasheet, by section
SpecificationValue
Efficiency
Max efficiency98.1%
European efficiency97.5%
Physical
IP ratingIP65
Installation requirements
Top clearance100 mm
Side clearance100 mm
AC breaker40 A
Cable gauge6 mm²
Earthing methodTN-S
DNSP pre-approvalYes
Estimated install time8 hrs

Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.

Features and CEC approval

Battery compatible
No
Backup capable
No
CEC approved
9 Sept 2026
Approval expiry
1 Sept 2027
Status
Active
Listed for STCs
Yes

About Ningbo Sunways Technologies

Years on the CEC list
4 years
Australian office
Not verified
Category
Budget
CEC-approved inverters
42
View full profile →
Explore your options

Get a quote from an installer sourced from the WA (Synergy/Plenti) approved list

  • Compare with other inverters→
  • Already have a quote? Check it→
  • Browse CEC-approved panels→

WA compliance

ESM compliant
Check

Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead. Ask your installer to confirm this inverter’s ESM status.

Perth performance

Estimate for a full-size array on this inverter

Daily yield
21.3 kWh
Annual yield
7,756 kWh

At 5 peak sun hours a day (BOM) with a 15% system derate.

4 years on the CEC list

How it compares

The Ningbo Sunways Technologies STS-5KTL-NS against the closest-power inverters from other brands.

Specification
Ningbo Sunways Technologies STS-5KTL-NSNingbo Sunways Technologies
Energizer FORCE 5.0HSEnergizer
Energizer Force 5.0HT+Energizer
Rated power?5 kW5 kW5 kW
Max efficiency?98.1%Not on fileNot on file
MPPT trackers?Not on fileNot on fileNot on file
PhasesSingle-phaseSingle-phaseThree-phase
TypeSolarHybridHybrid
Battery readyNoYesYes
Warranty10 yearsNot on fileNot on file

Specs from the CEC register and datasheet enrichment. Indicative: confirm exact figures with your installer.

Documents

  • DatasheetPDF, opens in a new tab
  • Warranty terms and installation guide and user manual and compliance certificatePDF, opens in a new tab

10-year inverter warranty

Ningbo Sunways Technologies STS-5KTL-NS

This inverter has a 10-year warranty covering defects in materials and workmanship. Warranty voids if misused or modified. To claim, contact customer support.

AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.

Coverage shape
Full-replacement coverage
If you sell the home
Transfers to the next homeowner
What voids it
Warranty voided if installed by untrained personnel or if modifications are made.
Environment limits
Operating temperatures above +60°C void the warranty.
Read the official warranty document (PDF)

Fault & error codes — Ningbo Sunways Technologies STS-5KTL-NS

From the install manual

16 documented

Showing 16 of 16. The official install manual is the authoritative source — always confirm before acting.

  • AC Transducer FaultcriticalCall your installer
    Manual (PDF)

    Fault in the AC transducer.

    Likely cause
    Issues with the inverter's current sensing.
    What to do
    Restart the inverter.
  • Bus Voltage FaultcriticalCall your installer
    Manual (PDF)

    Bus voltage is over the allowed limit.

    Likely cause
    Input voltage exceeds specification.
    What to do
    Check whether the input voltage is beyond the limit.
  • DCI FaultcriticalCall your installer
    Manual (PDF)

    Direct Current Input fault.

    Likely cause
    Internal issue with the inverter.
    What to do
    Restart the inverter.
  • GFCI Device FaultcriticalCall your installer
    Manual (PDF)

    Fault detected in the GFCI device.

    Likely cause
    Faulty ground fault circuit interrupter.
    What to do
    Restart the inverter.
  • GFCI FaultcriticalCall your installer
    Manual (PDF)

    Ground Fault circuit interrupt fault detected.

    Likely cause
    Possible ground fault in the system.
    What to do
    Restart the inverter.
  • Grid Frequency FaultcriticalCall your installer
    Manual (PDF)

    The grid frequency is outside allowed parameters.

    Likely cause
    Incorrect or poorly connected AC cable.
    What to do
    Check whether the AC cable is correct and well connected, or consider changing to another country with a wider protection range if permitted by the local electricity company.
  • Grid Voltage FaultcriticalCall your installer
    Manual (PDF)

    The grid voltage is outside allowed parameters.

    Likely cause
    The impedance of the AC cable may be too high, causing increase in grid voltage.
    What to do
    Change to a thicker AC cable if necessary, or extend the voltage protection range if allowed by the electricity company.
  • Inverter Over TemperaturecriticalCall your installer
    Manual (PDF)

    Inverter is too hot.

    Likely cause
    Input voltage may be over the limitation or insufficient cooling.
    What to do
    Check the input voltage and ensure the inverter has adequate cooling.
  • ISO Over LimitationcriticalCall your installer
    Manual (PDF)

    Isolated condition exceeds limits.

    Likely cause
    Internal issue or external connections.
    What to do
    Restart the inverter.
  • PV Over VoltagecriticalCall your installer
    Manual (PDF)

    Photovoltaic input voltage is too high.

    Likely cause
    Too many PV panels connected leading to excess voltage.
    What to do
    Reduce the number of PV panels to ensure the open-circuit voltage is within limits.
  • Relay Check FailcriticalCall your installer
    Manual (PDF)

    Relay operation check has failed.

    Likely cause
    Internal malfunction of relay.
    What to do
    Restart the inverter.
  • E2 FaultwarningCall your installer
    Manual (PDF)

    Error code indicating a system error.

    Likely cause
    General internal issue.
    What to do
    Restart the inverter.
  • Flash FaultwarningCall your installer
    Manual (PDF)

    Error related to the inverter's firmware.

    Likely cause
    Potential corruption of firmware or failure to flash properly.
    What to do
    Restart the inverter.
  • Mains Lostwarning
    Manual (PDF)

    No electricity from the mains supply detected.

    Likely cause
    The mains supply is lost or the AC breaker is not properly connected.
    What to do
    Check whether the mains supply is lost and ensure the AC breaker and terminal are well connected.
  • SCI FaultwarningCall your installer
    Manual (PDF)

    Serial Communication Interface fault.

    Likely cause
    Communication issue with inverter components.
    What to do
    Restart the inverter.
  • SPI FaultwarningCall your installer
    Manual (PDF)

    Serial Peripheral Interface fault.

    Likely cause
    Communication issue with peripherals.
    What to do
    Restart the inverter.

More Ningbo Sunways Technologies Co Ltd inverters

STS-5KTL (AS4777-2 2020)

5 kW · 1φ

STS-5KTL-P (AS4777-2 2020)

5 kW · 1φ

STH-5KTL-HS (AS4777-2 2020)

4.99 kW · 1φ

STH-4.6KTL-HS (AS4777-2 2020)

4.6 kW · 1φ

STS-4.6KTL-P (AS4777-2 2020)

4.6 kW · 1φ

STH-4.2KTL-HS (AS4777-2 2020)

4.2 kW · 1φ

View all Ningbo Sunways Technologies Co Ltd inverters

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

Or explore your battery options first →

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

About this data

All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.

Explore your optionsCompare inverters
Spotted something outdated?