Hybrid inverter · Deye · CEC approved November 2026

Deye SUN-7.6K-SG02LP1-AU-AM2-P

CEC listing: SUN-7.6K-SG02LP1-AU-AM2-P (AS4777-2 2020)

A 7.6 kW single-phase hybrid inverter that is battery-ready.

Rated power
7.6kW
How much solar it can run at once
Battery-ready
Yes
A battery plugs straight in
Feed-in credits (DEBS)
No
DEBS pays for exports only when the inverter is 5 kW or less

Get this inverter quoted in Perth

Enter your postcode and get a free, no-obligation quote from a member installer who covers your area.

Key specs, in plain terms

The numbers that matter for a home. The full datasheet is below.

Rated power
7.6kW
How much solar it can turn into usable power at once
Max efficiency
97.6%
How much of the solar you make reaches the house
Phases
Single
Runs on a standard single-phase supply
Type
Hybrid
Runs solar and a battery from one unit
Warranty
10yr
How long NingBo Deye Inverter Technology Co Ltd stands behind it

What we can tell you

Read from the figures on this page. No review written yet.

  • It is a hybrid inverter: solar and a battery run from the one unit, so adding a battery later doesn't need a second box.
  • It runs on a standard single-phase supply.
  • It is CEC-approved, which a new install needs to qualify for STCs.

Features and CEC approval

Battery compatible
Yes
Backup capable
Yes
CEC approved
20 Nov 2026
Approval expiry
7 Nov 2029
Status
Active
Listed for STCs
Yes

About Deye

Years on the CEC list
6 years
Australian office
Not verified
Category
Mid-Tier
CEC-approved inverters
94
CEC-approved batteries
53
View full profile →

Documents

WA compliance

Remote management
No record

Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead. We don't have a remote-management record for this model.

6 years on the CEC list

Perth performance

Estimate for a full-size array on this inverter

Daily yield
32.3 kWh
Annual yield
11,789 kWh

At 5 peak sun hours a day (BOM) with a 15% system derate.

Explore your options

Get a quote from an installer sourced from the WA (Synergy/Plenti) approved list

Full datasheet

Every figure on file for the Deye SUN-7.6K-SG02LP1-AU-AM2-P, by section.

Full datasheet, by section
SpecificationValue
Efficiency
Max efficiency97.6%
Physical
IP ratingIP65
Installation requirements
Top clearance420 mm
Side clearance233 mm
AC breaker52.2 A
Cable gauge10 mm²
Earthing methodL+N+PE
DNSP pre-approvalNo
Estimated install time8 hrs

Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.

How it compares

The Deye SUN-7.6K-SG02LP1-AU-AM2-P against the closest-power inverters from other brands.

Specification
Altenergy Power System ELS-7.6Altenergy Power System
Rated power?7.6 kW7.6 kW7.6 kW
Max efficiency?97.6%Not on fileNot on file
MPPT trackers?Not on fileNot on fileNot on file
PhasesSingle-phaseSingle-phaseSingle-phase
TypeHybridBatteryHybrid
Battery readyYesYesYes
Warranty10 yearsNot on fileNot on file

Specs from the CEC register and datasheet enrichment. Indicative: confirm exact figures with your installer.

10-year inverter warranty

Deye SUN-7.6K-SG02LP1-AU-AM2-P

This warranty covers defects for 10 years. Excludes damages from improper installation. Claims can be made with the serial number and purchase receipt.

AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.

Coverage shape
Full-replacement coverage
If you sell the home
Does not transfer with the home
What voids it
Non-accredited installation, modification, tampering, incorrect installation, force majeure.
Environment limits
None specified.

Fault & error codes — Deye SUN-7.6K-SG02LP1-AU-AM2-P

From the install manual

25 documented

Showing 25 of 25. The official install manual is the authoritative source — always confirm before acting.

  • F01criticalCall your installer
    Manual (PDF)

    DC input polarity reverse fault

    Likely cause
    1. Check the PV input polarity
    What to do
    Seek help from us, if cannot go back to normal state.
  • F07criticalCall your installer
    Manual (PDF)

    DC_START_Failure

    Likely cause
    1. The BUS voltage can be built from PV or battery
    What to do
    Restart the inverter, if the fault still exists, please contact us for help.
  • F15criticalCall your installer
    Manual (PDF)

    AC over current fault of software

    Likely cause
    AC side over current fault
    What to do
    1. Please check whether the backup load power and common load power are within the range; 2. Restart and check whether it is normal; 3. Seek help from us, if cannot go back to normal state.
  • F16criticalCall your installer
    Manual (PDF)

    AC leakage current fault

    Likely cause
    Leakage current fault
    What to do
    1. Check the PV side cable ground connection 2. Restart the system 2-3 times 3. if the fault still exists, please contact us for help.
  • F18criticalCall your installer
    Manual (PDF)

    AC over current fault of hardware

    Likely cause
    AC side over current fault
    What to do
    1. Please check whether the backup load power and common load power are within the range; 2. Restart and check whether it is normal; 3. Seek help from us, if cannot go back to normal state.
  • F20criticalCall your installer
    Manual (PDF)

    DC over current fault of the hardware

    Likely cause
    DC side over current fault
    What to do
    1. Check PV module connect and battery connect; 2. When in the off-grid mode, the inverter startup with big power load, it may report F20. Please reduce the load power connected; 3. Turn off the DC switch and AC switch and then wait one minute, then turn on the DC/AC switch again; 4. Seek help from us, if cannot go back to normal state.
  • F21criticalCall your installer
    Manual (PDF)

    Tz_HV_Overcurr_fault

    Likely cause
    BUS over current.
    What to do
    1. Check the PV input current and battery current setting 2. Restart the system 2-3 times. 3. If the fault still exists, please contact us for help.
  • F23criticalCall your installer
    Manual (PDF)

    Tz_GFCI_OC_current is transient over current

    Likely cause
    Leakage current fault
    What to do
    1. Check PV side cable ground connection. 2. Restart the system 2-3 times. 3. If the fault still exists, please contact us for help.
  • F24criticalCall your installer
    Manual (PDF)

    DC insulation failure

    Likely cause
    PV isolation resistance is too low
    What to do
    1. Check the connection of PV panels and inverter is firmly and correctly; 2. Check whether the PE cable of inverter is connected to ground; 3. Seek help from us, if cannot go back to normal state.
  • F34criticalCall your installer
    Manual (PDF)

    AC Overcurrent fault

    Likely cause
    1. Check the backup load connected, make sure it is in allowed power range; 2. If the fault still exists, please contact us for help.
    What to do
    Follow the troubleshooting steps.
  • F46criticalCall your installer
    Manual (PDF)

    backup battery fault

    Likely cause
    1. Please check each battery status, such as voltage/SOC and parameters etc., and make sure all the parameters are the same.
    What to do
    2. If the fault still exists, please contact us for help.
  • F55criticalCall your installer
    Manual (PDF)

    DC busbar voltage is too high

    Likely cause
    BUS voltage is too high
    What to do
    1. Check whether battery voltage is too high; 2. Check the PV input voltage, make sure it is within the allowed range; 3. Seek help from us, if cannot go back to normal state.
  • F56criticalCall your installer
    Manual (PDF)

    DC busbar voltage is too low

    Likely cause
    Battery voltage low
    What to do
    1. Check whether battery voltage is too low; 2. If the battery voltage is too low, using PV or grid to charge the battery; 3. Seek help from us, if cannot go back to normal state.
  • F58criticalCall your installer
    Manual (PDF)

    BMS communication fault

    Likely cause
    1. it tells the communication between hybrid inverter and battery BMS disconnected when 'BMS_Err-Stop' is active; 2. If don't want to see this happen, you can disable 'BMS_Err-Stop' item on the LCD; 3. If the fault still exists, please contact us for help.
    What to do
    Follow the troubleshooting steps.
  • F63criticalCall your installer
    Manual (PDF)

    ARC fault

    Likely cause
    1. ARC fault detection is only for the US market; 2. Check PV module cable connection and clear the fault; 3. Seek help from us, if cannot go back to normal state.
    What to do
    Follow the troubleshooting steps.
  • F64criticalCall your installer
    Manual (PDF)

    Heat sink high temperature failure

    Likely cause
    Heat sink temperature is too high
    What to do
    1. Check whether the work environment temperature is too high; 2. Turn off the inverter for 10 mins and restart; 3. Seek help from us, if cannot go back to normal state.
  • F13warning
    Manual (PDF)

    working mode change

    Likely cause
    1. When the grid type and frequency changed it will report F13; 2. When the battery mode was changed to 'No battery' mode, it will report F13; 3. For some old FW versions, it will report F13 when the system work mode changed; 4. Generally, it will disappear automatically when shows F13; 5. If still same, and turn off the DC switch and AC switch and wait for one minute and then turn on the DC/AC switch; 6. Seek help from us, if cannot go back to normal state.
    What to do
    Follow the troubleshooting steps.
  • F26warning
    Manual (PDF)

    The DC busbar is unbalanced

    Likely cause
    1. Please wait for a while and check whether it is normal; 2. When the load power of 3 phases is big different, it will report the F26; 3. When there's DC leakage current, it will report F26; 4. Restart the system 2-3 times; 5. Seek help from us, if cannot go back to normal state.
    What to do
    Follow the troubleshooting steps.
  • F29warning
    Manual (PDF)

    Parallel CAN Bus fault

    Likely cause
    1. When in parallel mode, check the parallel communication cable connection and hybrid inverter communication address setting; 2. During the parallel system startup period, inverters will report F29. But when all inverters are in ON status, it will disappear automatically; 3. If the fault still exists, please contact us for help.
    What to do
    Follow the troubleshooting steps.
  • F41warning
    Manual (PDF)

    Parallel system stop

    Likely cause
    1. Check the hybrid inverter work status. If there's 1pcs hybrid inverter shutdown, all hybrid inverters will report F41 fault; 2. If the fault still exists, please contact us for help.
    What to do
    Follow the troubleshooting steps.
  • F42warningCall your installer
    Manual (PDF)

    AC line low voltage

    Likely cause
    Grid voltage fault
    What to do
    Check the AC voltage is in the range of standard voltage specification; 2. Check whether grid AC cables are firmly and correctly connected; 3. Seek help from us, if cannot go back to normal state.
  • F47warningCall your installer
    Manual (PDF)

    AC over frequency

    Likely cause
    Grid frequency out of range
    What to do
    1. Check the frequency is in the range of specification or not; 2. Check whether AC cables are firmly and correctly connected; 3. Seek help from us, if cannot go back to normal state.
  • F48warningCall your installer
    Manual (PDF)

    AC lower frequency

    Likely cause
    Grid frequency out of range
    What to do
    1. Check the frequency is in the range of specification or not; 2. Check whether AC cables are firmly and correctly connected; 3. Seek help from us, if cannot go back to normal state.
  • Tz_EmergStop_Fault

    Likely cause
    Remotely shutdown
    What to do
    It tells the inverter is remotely controlled.
  • DRMs0_stop

    Likely cause
    1. the DRM function is for the Australia market only; 2. Check the DRM function is active or not; 3. Seek help from us, if cannot go back to normal state after restarting the system.
    What to do
    Follow the troubleshooting steps.

More Deye inverters

View all Deye inverters

More from Deye

Other CEC-approved products from Deye available in Australia.

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

About this data

All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.