Loading Solar Battery Perth...
Loading Solar Battery Perth...
Product specifications, pricing, and availability are subject to change without notice. We make no warranties regarding product performance, longevity, or suitability for your specific needs.
Always verify specifications with the manufacturer and installer before purchase. Warranty terms are set by manufacturers and may have conditions not disclosed here. Battery performance degrades over time.
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
Covers defects in materials and workmanship for 10 years. Major exclusions include unauthorized modifications. Claims require the original purchase receipt and product details.
10
years
∞
MWh
55°
celsius
Level 0
No Backup
We have not verified this brand's Australian support structure. Confirm warranty arrangements with the manufacturer or your installer.
Suited to Perth climate
Rated to 55°C, which covers Perth's hottest days.
CSIP-AUS compliant
Inverter must be CSIP-AUS compliant under the current WA framework.
Synergy SSL approved inverter
Needs pairing with a Synergy SSL approved inverter.
VPP activation ready
VPP activation requires a Synergy SSL approved inverter.
WA Battery Scheme rebate
Requires Battery Rewards participation under the current WA framework.
Synergy Battery Rewards
Requires a CSIP-AUS compliant system and reliable internet.
Interest-free loan
Not eligible for interest-free financing.
Under current WA rules, new rebate applications require VPP enrolment and CSIP-AUS compliance. How the scheme works · Estimate VPP earnings
6 years in the Australian market
Extracted from the installation manual
Showing 19 of 19. The official install manual is the authoritative source — always confirm before acting.
F08criticalCall your installerGFDI Relay Failure
F22criticalCall your installerTz Emerg Stop Fault
F35criticalCall your installerNo AC grid
F63criticalCall your installerARC fault
F64criticalCall your installerHeat sink high temperature failure
F18warningCall your installerAC over current fault
F20warningCall your installerDC over current fault
F23warningCall your installerAC leakage current is transient over current
F24warningCall your installerDC insulation impedance failure
F26warningCall your installerThe DC busbar is unbalanced
F34warningCall your installerAC Overcurrent fault
F42warningCall your installerAC line low voltage
F47warningCall your installerAC over frequency
F48warningCall your installerAC lower frequency
F56warningCall your installerDC busbar voltage is too low
F58warningCall your installerBMS communication fault
F13infoWorking mode change
F29infoParallel CANBus fault
F41infoParallel system stop
Typical installed price
$29,184
Prices are estimates. Final pricing depends on installation requirements. STC value is based on the current certificate price of about $39.9.
The WA Battery Scheme rebate (up to $1,300) requires a Synergy-approved (SSL) inverter and VPP enrolment — not all systems qualify, so it is not included above. Confirm eligibility with your installer.
Insufficient Data for Scoring
3 of 5 critical specs available (need 4)
Part of the Deye AI-W
See all configurations in this series →
Compare this battery with other models to find the best fit for your needs.
Compare ProductsThe Deye AI-W30.7-B against the closest-sized batteries from other brands.
| Specification | Deye AI-W30.7-BDeye | DMEGC H02-30DMEGC | Dyness STACK100 Pro-6SDyness |
|---|---|---|---|
| Usable capacity? | 30.72 kWh | 30.72 kWh | 30.72 kWh |
| Continuous power? | 12 kW | Not verified | Not verified |
| Peak power? | 360 kW | Not verified | Not verified |
| Round-trip efficiency? | 70% | 92%best value | 92%best value |
| Warranty | 10 years | 10 years | 10 years |
| Chemistry | LiFePO₄ | LFP | LFP |
Specs from the CEC register and datasheet enrichment. Indicative — confirm exact figures with your installer.
Other CEC-approved products from Deye available in Australia.
Compare quotes from SAA-accredited local installers — you choose which to act on. No obligation, no pressure.