Loading Solar Battery Perth...
Loading Solar Battery Perth...
Solar inverter · FoxESS · F-G2 series · CEC approved May 2026
CEC listing: F5000-G2 (AS4777-2 2020)
A 5 kW single-phase solar inverter.
Read from the figures on this page. No review written yet.
The numbers that matter for a home. The full datasheet is below.
Rated power
How much solar it can turn into usable power at once
Phases
Runs on a standard single-phase supply
Type
Runs solar only
Warranty
How long FOXESS Co Ltd stands behind it
Every figure on file for the FoxESS F5000-G2, by section.
| Specification | Value |
|---|---|
| Physical | |
| IP rating | IP65 |
| Installation requirements | |
| Top clearance | 300 mm |
| Side clearance | 300 mm |
| AC breaker | 25 A |
| Cable gauge | 4 mm² |
| Earthing method | TN-S |
| DNSP pre-approval | Yes |
| Estimated install time | 5 hrs |
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
Battery compatible
No
Backup capable
No
CEC approved
8 May 2026
Approval expiry
28 Oct 2027
Status
Active
Eligible for rebates
Yes
Years in AU Market
7 years
Australian Office
Yes
CEC-Approved Batteries
116
CEC-Approved Panels
0
Category
Mid-Tier
Typical installed, inverter only
$1,000–$2,000
Prices vary by installer, configuration and site complexity. Get exact quotes from installers you choose.
Compare quotes from installers you choose
Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead — ask your installer to confirm this inverter’s ESM status.
Estimate for a full-size array on this inverter
At 5 peak sun hours a day (BOM) with a 15% system derate.
Australian office
Has local presence
Website
au.fox-ess.comThe FoxESS F5000-G2 against the closest-power inverters from other brands.
| Specification | FoxESS F5000-G2FoxESS | Energizer FORCE 5.0HSEnergizer | Energizer Force 5.0HT+Energizer |
|---|---|---|---|
| Rated power? | 5 kW | 5 kW | 5 kW |
| Max efficiency? | 0.0% | 0.0% | 0.0% |
| MPPT trackers? | Not verified | Not verified | Not verified |
| Phases | Single-phase | Single-phase | Three-phase |
| Type | Solar | Hybrid | Hybrid |
| Battery ready | No | Yes | Yes |
| Warranty | 10 years | Not verified | Not verified |
Specs from the CEC register and datasheet enrichment. Indicative — confirm exact figures with your installer.
This 10-year warranty covers defects in materials and workmanship. Major exclusions include unqualified installation and environmental damage. For claims, contact customer service.
AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.
From the install manual
Showing 10 of 10. The official install manual is the authoritative source — always confirm before acting.
Bus OVPcriticalCall your installerBus OVP - Disconnect PV (+), PV (-) with DC. - After the LCD switches off, reconnect and check again.
GFC FaultcriticalCall your installerGFC Fault - Disconnect DC and AC connector, check the surrounding equipment on the AC side. - Reconnect the input connector and check the state of inverter after troubleshooting.
Ground FaultcriticalCall your installerGround Fault - Check the voltage of neutral and PE. - Check AC wiring. - Restart inverter, if error message persists, seek for help from us.
Isolation FaultcriticalCall your installerIsolation Fault - Check the impedance among PV (+), PV (-) and ground. Impedance should be >1Mohm. - Please seek for help from us if it cannot be detected or the impedance is <1Mohm.
DCI FaultwarningCall your installerDCI Fault - Wait for one minute after the inverter reconnects to grid. - Disconnect PV (+), PV (-) with DC. - After the LCD switches off, reconnect and check again.
EEPROM FaultwarningCall your installerEEPROM Fault - Disconnect PV (+), PV (-) with DC. - After the LCD switches off, reconnect and check again.
Grid 10Min OVPwarningCall your installerGrid 10Min OVP - System will reconnect if the grid is back to normal. - Or seek for help from us if it does not go back to normal state.
Grid Freq FaultwarningCall your installerGrid Freq Fault - Wait for one minute, grid may go back to normal working state. - Make sure that grid voltage and frequency complies with standards.
Over TempwarningCall your installerOver Temp - Check if the environment temperature is over the limit. - Or seek for help from us.
SPS FaultwarningCall your installerSPS Fault - Turn off the PV and grid, reconnect them. - Please seek for help from us if it does not go back to normal state.
Part of the FoxESS F-G2 series
Compare every FoxESS F-G2 variant side by side →
1K5-1P-HI-10.5 (AS4777-2 2020)
10.5 kW · 1φ
1K5-1P-HI-10 (AS4777-2 2020)
10 kW · 1φ
1K5-1P-HI-3.7 (AS4777-2 2020)
3.68 kW · 1φ
1K5-1P-HI-4.6 (AS4777-2 2020)
4.6 kW · 1φ
1K5-1P-HI-5 (AS4777-2 2020)
5 kW · 1φ
1K5-1P-HI-6 (AS4777-2 2020)
6 kW · 1φ
Other CEC-approved products from FOXESS Co Ltd available in Australia.
Get a quote from an installer from our network that covers your area. You choose whether to act on it. No obligation.
About this data
All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.