Loading Solar Battery Perth...
Loading Solar Battery Perth...
Rated Power
10 kW
Max Efficiency
—
Phases
Three Phase
Max Input Voltage
—
Min Input Voltage
—
Max Input Current
—
Output Voltage
—
Max Output Current
—
Country of Origin
Unknown
Series
ELT
Warranty
25 years
Dimensions
0 x 0 x 0 mm
IP Rating
IP65
Operating Temp
-25°C to 60°C
Cooling
Natural
Battery Compatible
No
Backup Capable
No
ESM Compliant
No
Black Start
No
Grid Forming
No
Export Limiting
No
Remote Monitoring
No
CEC Approved
26 June 2025
Approval Expiry
26 June 2028
Status
Active
Eligible for Rebates
Yes
Years in AU Market
1 years
Australian Office
Not verified
CEC-Approved Batteries
0
CEC-Approved Panels
0
Category
Budget
$2,000–$4,000
Perth installed price estimate · medium confidence
Prices vary by installer, configuration, and site complexity. Get exact quotes via our installer matching.
From May 1, 2026, all new battery installations in WA require CSIP-AUS compliant inverters. Verify ESM status with your installer.
Perth's high ambient temperatures (regularly 35°C+) can reduce inverter efficiency and trigger thermal throttling. For installations in direct sun or non-ventilated garages, consider inverters with active cooling and wide operating temperature ranges. All grid-connected installations require Western Power approval. Systems above 5kVA require ESM compliance under WA regulations.
Compare this inverter with batteries for a complete system analysis
Based on 5 PSH/day (BOM) with 15% system derate.
The Altenergy Power System Inc ELT-10 (AS4777-2 2020) against the closest-power inverters from other brands.
| Specification | Altenergy Power System Inc ELT-10 (AS4777-2 2020)Altenergy Power System Inc | 8 Star Energy Pty Ltd Force 10.0HS+ (AS4777-2 2020)8 Star Energy Pty Ltd | 8 Star Energy Pty Ltd Force 10.0HT+ (AS4777-2 2020)8 Star Energy Pty Ltd |
|---|---|---|---|
| Rated power? | 10 kW | 10 kW | 10 kW |
| Max efficiency? | 0.0% | 0.0% | 0.0% |
| MPPT trackers? | Not verified | Not verified | Not verified |
| Phases | Three-phase | Single-phase | Three-phase |
| Type | Solar | Hybrid | Hybrid |
| Battery ready | No | Yes | Yes |
| Warranty | 25 years | Not verified | Not verified |
Specs from the CEC register and datasheet enrichment. Indicative — confirm exact figures with your installer.
The APsystems warranty covers defects in materials and workmanship for up to 25 years, providing options for repair, replacement, or refund. Key exclusions include improper installation, use of unauthorized components, or environmental damages.
AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.
Part of the Altenergy Power System Inc ELT series
Compare every Altenergy Power System Inc ELT variant side by side →
DS3 (AS4777-2 2020)
0.88 kW · 1φ
DS3-H (AS4777-2 2020)
0.96 kW · 1φ
DS3-L (AS4777-2 2020)
0.75 kW · 1φ
DS3-S (AS4777-2 2020)
0.625 kW · 1φ
DS3D (AS4777-2 2020)
1.8 kW · 1φ
DS3D (AS4777-2 2020)
1.8 kW · 1φ
Compare quotes from SAA-accredited local installers — you choose which to act on. No obligation, no pressure.
About this data
All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.