Jinko vs LONGi panels: Tiger Neo and Hi-MO compared

Jinko and LONGi both make current-generation N-type panels sold in Perth: Jinko's Tiger Neo and LONGi's Hi-MO. On the spec sheet the two ranges sit close together. Here is how they compare on the facts, for a WA roof, and what to check on the exact models quoted.

Last updated: 3 November 2026

Quick answer

Jinko tends to suit buyers who want current-generation N-type TOPCon efficiency. LONGi tends to suit buyers who prioritise efficiency and want panels from a maker that also makes its own wafers. Both ranges qualify for federal STCs in Perth (STC Zone 3); there's no separate WA panel rebate.

Sources: CEC register · federal STC scheme

Get Jinko or LONGi quoted in Perth

Enter your postcode and get a free, no-obligation quote from a member installer who covers your area.

Jinko vs LONGi at a glance

Jinko vs LONGi at a glance
TopicJinkoLONGi
Tends to suitBuyers who want current-generation N-type TOPCon efficiency.Buyers who prioritise efficiency and want panels from a maker that also makes its own wafers.
WA rebatePanels qualify for federal STCs (Perth is STC Zone 3); the exact value depends on system size and the STC spot price. There's no separate panel rebate.Panels qualify for federal STCs (Perth is STC Zone 3); value depends on system size and the STC spot price. No separate panel rebate.
How it's builtN-type TOPCon modules (the Tiger Neo range), current-generation cell technology.N-type modules (the Hi-MO range) built on LONGi's own monocrystalline wafer supply chain.
OriginJinko makes solar panels (the Tiger Neo range), sold in Perth.LONGi makes monocrystalline wafers and solar panels (the Hi-MO range), sold in Perth.
Australian supportEstablished Australian distribution presence.Established Australian distribution presence.

Any spec table below takes each brand's models from the CEC register. The written comparison is our own summary. Specs, prices and eligibility change, so check the current details with your installer.

Jinko vs LONGi: how they compare

Jinko

The Tiger Neo panel range, using N-type TOPCon cells.

LONGi

The Hi-MO N-type panel range.

Strengths

Jinko

  • Current-generation N-type TOPCon efficiency

LONGi

  • Makes its own monocrystalline wafers as well as modules
  • Current-generation Hi-MO N-type efficiency

Things to weigh

Jinko

  • Large model range, so confirm the exact Tiger Neo model and wattage quoted
  • Compare product vs performance warranty terms across shortlisted panels

LONGi

  • Confirm the exact Hi-MO generation/model quoted (the range updates often)
  • Compare warranty terms against other shortlisted panels

Frequently asked questions

Both run current-generation N-type modules in similar efficiency bands; the gap between specific models is usually small. Compare the exact model and rated efficiency on each quote rather than the brand name.
Panels qualify for federal STCs (Perth is STC Zone 3). The STC value depends on system size and the STC spot price, and is usually applied as an upfront discount. There's no separate WA panel rebate.
Both publish temperature coefficients in a similar range, and N-type cells generally behave well in heat. Compare the temperature coefficient on the specific models quoted, and make sure the array has good roof ventilation.
Both offer product and performance warranties. Compare the exact product-warranty years and the performance-degradation curve on the models you're quoted.

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

Not ready for a quote? Solar Battery Perth's battery matcher shows the systems that fit your usage, budget and backup needs, or you can compare all panels.

Sources

  • Clean Energy Council approved module list, checked 17 November 2026

Where next