Aiko vs LONGi: the two panel ranges compared

Aiko and LONGi both make N-type panels sold in Perth. Aiko builds all-back-contact (ABC) panels, with every contact on the rear of the cell. LONGi makes its own monocrystalline wafers and the Hi-MO range. The differences matter most on a WA roof where space is short.

Last updated: 3 November 2026

Quick answer

Aiko tends to suit buyers who prioritise output per panel or have constrained roof space. LONGi tends to suit buyers who prioritise efficiency and want panels from a maker that also makes its own wafers. Both ranges qualify for federal STCs in Perth (STC Zone 3); there's no separate WA panel rebate.

Sources: CEC register · federal STC scheme

Get Aiko or LONGi quoted in Perth

Enter your postcode and get a free, no-obligation quote from a member installer who covers your area.

Aiko vs LONGi at a glance

Aiko vs LONGi at a glance
TopicAikoLONGi
Tends to suitBuyers who prioritise output per panel or have constrained roof space.Buyers who prioritise efficiency and want panels from a maker that also makes its own wafers.
WA rebatePanels qualify for federal STCs (Perth is STC Zone 3); value depends on system size and the STC spot price. No separate panel rebate.Panels qualify for federal STCs (Perth is STC Zone 3); value depends on system size and the STC spot price. No separate panel rebate.
How it's builtAll-back-contact (ABC) N-type modules: the contacts move to the rear of the cell for high efficiency and a clean all-black appearance.N-type modules (the Hi-MO range) built on LONGi's own monocrystalline wafer supply chain.
OriginAiko makes all-back-contact solar panels, sold in Perth.LONGi makes monocrystalline wafers and solar panels (the Hi-MO range), sold in Perth.
Australian supportAustralian distribution presence.Established Australian distribution presence.

Any spec table below takes each brand's models from the CEC register. The written comparison is our own summary. Specs, prices and eligibility change, so check the current details with your installer.

Aiko vs LONGi: how they compare

Aiko

All-back-contact (ABC) N-type panels with the contacts on the rear of the cell.

LONGi

The Hi-MO N-type panel range.

Strengths

Aiko

  • All-back-contact design with a clean all-black appearance

LONGi

  • Makes its own monocrystalline wafers as well as modules
  • Current-generation Hi-MO N-type efficiency

Things to weigh

Aiko

  • Newer to the market than the longest-established panel makers, so its track record is shorter
  • Weigh the quoted price per panel against the extra output per panel

LONGi

  • Confirm the exact Hi-MO generation/model quoted (the range updates often)
  • Compare warranty terms against other shortlisted panels

Frequently asked questions

It matters most on a small or crowded roof, where more output per panel adds up. On a large, open roof the gap matters less. Compare the rated efficiency in any CEC register table on this page with the output per panel on each quote.
LONGi has the longer history. Aiko is newer. Compare the product and performance warranty terms, and ask your installer about their experience with each.
Panels qualify for federal STCs (Perth is STC Zone 3); value depends on system size and the STC spot price. There's no separate WA panel rebate.
Where roof space is short, output per panel matters most, and that is what Aiko's back-contact design is built for. On a large roof, compare total system output across the two quotes instead.

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

Not ready for a quote? Solar Battery Perth's battery matcher shows the systems that fit your usage, budget and backup needs, or you can compare all panels.

Sources

  • Clean Energy Council approved module list, checked 17 November 2026

Where next