Loading Solar Battery Perth...
Loading Solar Battery Perth...
Home battery · KSTAR · CEC approved July 2026
A 140.49 kWh home battery — very big home size, the 40+ kWh band.
Read from the figures on this page — no review written yet
The numbers that matter for a home. The full datasheet is below.
Usable capacity
How much energy it stores for you to use
Continuous power
How much it can run at once — enough for a whole home, air conditioning included
Round-trip efficiency
How much of the energy you store comes back out
Depth of discharge
How much of the battery you can actually use
Warranty
80% of capacity guaranteed at the end of it
Battery chemistry
Lithium iron phosphate — the long-cycle-life type
Every figure on file for the KSTAR BluePulse, by section.
| Specification | Value |
|---|---|
| Cell & chemistry | |
| Chemistry | LFP |
| Capacity & power | |
| Continuous power | 50 kW |
| Round-trip efficiency | 97.5% |
| Lifespan & degradation | |
| Capacity retained at year 10 | 80% |
| Warranted throughput | 2.62 MWh |
| Physical | |
| Dimensions (H×W×D) | 2380 × 1100 × 1100 mm |
| Weight | 75 kg |
| IP rating | IP54 |
| Installation requirements | |
| Top clearance | 500 mm |
| Side clearance | 600 mm |
| Front clearance | 600 mm |
| AC breaker | 32 A |
| Cable gauge | 10 mm² |
| DNSP pre-approval | No |
| Estimated install time | 8 hrs |
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
The warranty covers defects in materials and workmanship for 5 years. Excludes damage from improper use or bad installation. Claims can be made by contacting KSTAR with the required information.
5
years
2.62
MWh
45°
celsius
Level 0
No Backup
We have not verified this brand's Australian support structure. Confirm warranty arrangements with the manufacturer or your installer.
Suitable with precautions
Rated to 45°C. Plan for a shaded or garage install through Perth summers.
CSIP-AUS compliant
Inverter must be CSIP-AUS compliant under the current WA framework.
Synergy SSL approved inverter
Needs pairing with a Synergy SSL approved inverter.
VPP activation ready
VPP activation requires a Synergy SSL approved inverter.
WA Battery Scheme rebate
Requires Battery Rewards participation under the current WA framework.
Synergy Battery Rewards
Requires a CSIP-AUS compliant system and reliable internet.
Interest-free loan
Not eligible for interest-free financing.
Under current WA rules, new rebate applications require VPP enrolment and CSIP-AUS compliance. How the scheme works · Estimate VPP earnings
4 years in the Australian market
Extracted from the installation manual
Showing 47 of 47. The official install manual is the authoritative source — always confirm before acting.
F01criticalCall your installerINV Volt Short
F02criticalCall your installerGFCI Sensor Fault
F06criticalCall your installerBus Short Circuit
F07criticalCall your installerPV ISO Under Fault
F08criticalCall your installerPV Input Short Circuit
F10criticalCall your installerINV Curr Over
F11criticalCall your installerINV DC Over
F14criticalCall your installerGrid Relay Fault
F15criticalCall your installerDisChg Curr Over
F16criticalCall your installerChg Curr Over
F19criticalCall your installerEPS Relay Fault
F20criticalCall your installerAlway Over Load
W05criticalCall your installerBat Loss
W09criticalCall your installerOver Load
W10criticalCall your installerGFCI Over
W11criticalCall your installerLN Reverse
W17criticalCall your installerBMS Over Temp
W21criticalCall your installerBMS Under Volt
W23criticalCall your installerBMS Severe Over Volt
W24criticalCall your installerBMS Severe Over Temp
F00warningSoft Time Out
F04warningCall your installerBus Volt Low
F05warningCall your installerBus Volt High
F09warningCall your installerBypass Relay Fault
F12warningCall your installerAmbient Over Temp
F13warningCall your installerSink Over Temp
F17warningCall your installerCurrent Sensor Fault
F18warningCall your installerINV Abnormal
F32warningCall your installerSCI Fault
W00warningCall your installerGrid Volt Low
W01warningCall your installerGrid Volt High
W02warningCall your installerGrid Frequency Low
W03warningCall your installerGrid Frequency High
W04warningCall your installerSolar Loss
W06warningCall your installerBat Under Volt
W07warningCall your installerBat Volt Low
W08warningCall your installerBat Volt High
W12warningCall your installerFan Fault
W13warningCall your installerBAT Power Down
W14warningCall your installerBMS Discharge Over Current
W15warningCall your installerBMS Charge Over Current
W16warningCall your installerBMS Over Volt
W18warningCall your installerBMS Discharge Low Temp
W19warningCall your installerBms Volt Imbalance
W20warningCall your installerBms Communicate Fault
W22warningCall your installerBms Chg Temp Low
W25warningCall your installerCT Reverse
$126,441
Typical installed price, before rebates
The WA Battery Scheme (up to $1,300) needs a Synergy-approved inverter and VPP enrolment. We don't know which inverter you'd pair this with, so it isn't deducted above — ask your installer. STCs assume about $39.9 a certificate. Estimates only; your quote will vary.
Usable capacity, for one battery system
This battery is one unit in the very big home band. The WA rebate caps at 10 kWh, but that is a rebate limit, not a sizing guide.
STC value for this 140.49 kWh battery
The KSTAR BC143DE2 against the closest-sized batteries from other brands.
| Specification | KSTAR BC143DE2KSTAR | ||
|---|---|---|---|
| Usable capacity? | 140.49 kWhbest value | 140.4 kWh | 140.4 kWh |
| Continuous power? | 50 kW | Not verified | Not verified |
| Peak power? | Not verified | Not verified | Not verified |
| Round-trip efficiency? | 98%best value | 92% | 92% |
| Warranty | 5 years | 10 yearsbest value | 10 yearsbest value |
| Chemistry | LFP | LFP | LFP |
Specs from the CEC register and datasheet enrichment. Indicative — confirm exact figures with your installer.
Other CEC-approved products from KSTAR available in Australia.
Compare quotes from SAA-accredited local installers — you choose which to act on. No obligation.
This model is one entry in the desk's index of solar batteries for Perth — every CEC-approved battery on one comparable dataset.
Product specifications, pricing, and availability are subject to change without notice. We make no warranties regarding product performance, longevity, or suitability for your specific needs.
Always verify specifications with the manufacturer and installer before purchase. Warranty terms are set by manufacturers and may have conditions not disclosed here. Battery performance degrades over time.