Solar inverter · Sidek Manufacturing · CEC approved July 2024
Sidek Manufacturing PV360R
A single-phase solar inverter.
- Battery-ready
- No
- A battery later means a hybrid swap or a second inverter
Key specs, in plain terms
The numbers that matter for a home. The full datasheet is below.
- Rated power
- Not on file: we don't have this figure from the manufacturer's documents yet
- How much solar it can turn into usable power at once
- Max efficiency
- Not on file: we don't have this figure from the manufacturer's documents yet
- How much of the solar you make reaches the house
- Phases
- Single
- Runs on a standard single-phase supply
- Type
- Solar
- Runs solar only
- Warranty
- 10yr
- How long Sidek Manufacturing Pty Ltd stands behind it
Not on file: we don’t have these figures from the manufacturer’s documents yet, so we leave them blank rather than print typical values. Ask your installer to confirm them on the quote. Seen it in a document? Tell us
What we can tell you
Read from the figures on this page. No review written yet.
- It is a solar-only inverter: adding a battery later means replacing it with a hybrid inverter, or keeping it and adding an AC-coupled battery, which in WA counts as an alteration with whole-of-site compliance.
- It runs on a standard single-phase supply.
- This model isn't on Synergy's list dated 6 November 2026, so it has no battery-storage (DER-Storage) listing, which the WA Battery Scheme needs.
- It is CEC-approved, which a new install needs to qualify for STCs.
Features and CEC approval
- Battery compatible
- No
- Backup capable
- No
- CEC approved
- 2 July 2024
- Approval expiry
- 2 July 2027
- Status
- Active
- Listed for STCs
- Yes
About Sidek Manufacturing
- Years on the CEC list
- 2 years
- Australian office
- Not verified
- Category
- Unknown
- CEC-approved inverters
- 1
Documents
WA compliance
- Synergy's list
- Not listed
- Remote management
- No record
This model isn't on Synergy's list dated 6 November 2026, so it has no battery-storage (DER-Storage) listing, which the WA Battery Scheme needs.Western Power approval is required for every grid-connected install. Under Emergency Solar Management, a new system must be remotely manageable, or take an export limit instead. We don't have a remote-management record for this model.
Get a quote from an installer sourced from the WA (Synergy/Plenti) approved list
Full datasheet
Every figure on file for the Sidek Manufacturing PV360R, by section.
| Specification | Value |
|---|---|
| Installation requirements | |
| Top clearance | 50 mm |
| Side clearance | 50 mm |
| AC breaker | 20 A |
| Cable gauge | 4 mm² |
| Earthing method | TN-S |
| DNSP pre-approval | No |
| Estimated install time | 4 hrs |
Parsed from the manufacturer datasheet, install manual, and warranty document. Confirm against the linked PDFs before relying on a value for a quote or installation.
10-year inverter warranty
Sidek Manufacturing PV360RThis warranty covers defects for 10 years. Key exclusions include unauthorized modifications. To claim, contact support with your warranty details.
AI-summarised from the manufacturer warranty document. Always confirm against the linked PDF before relying on it for a claim.
- Coverage shape
- Pro-rata — value reduces with age
- If you sell the home
- Transfers to the next homeowner
- What voids it
- Void if installed by non-accredited personnel or modified after installation.
- Environment limits
- Salt spray and temperatures above 50°C void coverage.
Want to take the next step?
Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.
About this data
All inverter specifications are sourced from the CEC Approved Products Register. Specifications are provided as published by the CEC and may differ from manufacturer datasheets. Verify current specifications with the manufacturer or your installer before purchasing. Not all listed models may be currently available in Western Australia.
