Skip to main content
Solar Battery PerthSolar Battery Perth
  • Library
  • Compare
  • Calculate savings
  • Quote
  • Tools
Battery matcher
Battery matcher

Rebate and policy updates by email

What's changing with WA rebates and battery rules, for Perth homeowners.

Solar Battery Perth

WA-specific solar and battery tools with transparent installer matching for Synergy and Western Power customers.

  • 08 9429 8803
  • info@solarbatteryperth.com.au
Explore your optionsCompare products

Tools

  • Solar system quiz
  • Side-by-side comparison
  • Savings calculator
  • Tariff comparison
  • VPP earnings
  • Quote evaluator
  • Warranty comparison
  • Library
  • Product search
  • All tools

Information

  • How it works
  • Resources
  • WA rebates & incentives
  • Battery price index
  • Synergy tariffs
  • Financing
  • Getting started
  • Buyer's guide
  • Solar and battery integration
  • Battery scenarios

Get started

  • Find installers
  • Perth suburbs
  • Brands
  • Contact us
  • Common questions
Privacy policyTerms of useDisclaimerReview policyAffiliate disclosureAccessibility

© 2026 Solar Battery Perth, operated by WattMate Pty Ltd. Independent solar and battery resource for WA homeowners.

Installers pay us a flat $30 including GST per accepted lead, the same for every installer and every system. How it works

45 Ventnor Avenue, West Perth WA 6005

  • Home
  • Library
  • Compare
  • Savings
  • Quote

Want to take the next step?

Get a quote from a member installer who covers your area. You choose whether to act on it. No obligation.

We collect these details to prepare your quote match and to share with the installer(s) we match you with. Not providing them means we can't match you. Full collection notice.

Or explore your battery options first →

By requesting quotes you agree to be contacted by installers in our network about your enquiry. Part of WattMate Pty Ltd. No spam, opt out any time.

Where next

WA battery rebate: are you eligible?

Synergy customers get $130/kWh back, capped at $1,300.

Synergy Battery Rewards: what the VPP pays

Activation events credit 70¢/kWh on top of DEBS exports, and signing up is a WA rebate condition.

All tools & calculators

Every Perth solar and battery calculator: sizing, savings, warranty, and more.

Explore your options

Answer a few questions and see systems and installers that fit your home.

Solar installation checklist

Everything you need to check before, during, and after your solar + battery installation in Perth. WA-specific requirements included.

0 of 20 complete0%
Before installation
Equipment
Installation day
After installation
Email

Installation timeline

What to organise around the house at each stage, from booking through your first week.

Planning phase
2-4 weeks before installation
  • Confirm installation date and time window with installerImportant

    Most installations take 4-8 hours depending on system complexity

  • Review and sign installation contract

    Check warranty terms, payment schedule, and included work

  • Confirm Western Power connection approval (if required)Important

    Your installer should handle this, but confirm it's been submitted

  • Check council permit status (if required for your area)

    Most residential installations don't need permits, but check with your installer

  • Arrange time off work if installation is during business hours

    Someone 18+ must be home during installation

  • Notify neighbours if installation requires street access

    Especially if parking space needed for installation vehicle

Home preparation
1 week before installation
  • Clear path to switchboard locationImportant

    Installers need clear access to work safely

  • Clear area where battery will be mountedImportant

    Battery needs clearance: 300mm sides, 600mm front for ventilation

  • Move vehicles from driveway if access needed

    Installers may need to park close to installation location

  • Secure pets on installation day

    Keep pets contained away from work area

  • Locate and test existing solar inverter (if applicable)

    Note any error codes or issues to discuss with installer

  • Check your monitoring app credentials work

    You'll want to monitor the new system immediately

Final checks
Day before installation
  • Charge devices; power will be off for 1-2 hoursImportant

    Laptop, phones, any essential devices

  • Check weather forecast

    Heavy rain may delay installation; your installer will contact you

  • Confirm installer arrival time

    Get installer's mobile number for day-of contact

  • Prepare questions for installer

    Write down any questions about operation, maintenance, monitoring

  • Set alarm for fridge/freezer

    Move critical items to esky if power outage will be extended

  • Back up any scheduled recordings (PVR)

    Power interruption may affect scheduled recordings

During installation
Installation day
  • Be home to greet installer and confirm accessImportant

    Show installer switchboard, proposed battery location, any concerns

  • Confirm final battery placement before mountingImportant

    Once mounted, battery cannot easily be moved

  • Stay available for questions during installation

    Installer may need to confirm cable routing or other decisions

  • Take photos of installation progress

    Useful for warranty claims and your records

  • Note any issues or changes to original plan

    Document any variations agreed during installation

After installation
Commissioning and handover
  • Walk through system operation with installerImportant

    Understand normal operation, indicators, and what to do if something seems wrong

  • Get monitoring app installed and connectedImportant

    Installer should set this up and show you how to use it

  • Receive all documentation and certificatesImportant

    Certificate of Compliance (CoC), warranty documents, manuals

  • Understand warranty registration requirements

    Some manufacturers require registration within 30-90 days

  • Confirm Western Power notification has been submitted

    Required for grid-connected systems

  • Get emergency contact details

    Who to call for urgent issues vs routine questions

  • Make final payment as per contract terms

    Only after satisfactory commissioning and documentation received

Getting familiar
First week after installation
  • Monitor battery charging and discharging patterns

    Normal: charges during solar hours, discharges in evening

  • Register warranty with manufacturerImportant

    Required by most manufacturers to activate full warranty

  • Set up alerts in monitoring app

    Get notified of any unusual behaviour or errors

  • Test backup power (if applicable)

    Some systems let you test blackout behaviour safely

  • Note baseline energy usage patterns

    Compare to your bills later to measure savings

  • Save all documentation securely

    Digital copies in cloud storage, physical copies in safe place

Perth-specific considerations

Summer installation

Schedule summer installations for early morning to avoid peak heat. Batteries should not be mounted in spots that get direct afternoon sun.

Western Power requirements

All grid-connected batteries must be registered with Western Power. Your installer handles this, but approval can take 2-4 weeks.

AS/NZS 5139 compliance

All battery installations in Australia must meet the AS/NZS 5139 safety standard. Your installer must provide a Certificate of Compliance.

Documentation you should receive
Don't sign off until you have all of these documents

From the installer

  • Certificate of Compliance (CoC)
  • Electrical work record
  • System design documentation
  • As-built diagram
  • Installation photos
  • Handover/commissioning form

From the manufacturer

  • Product warranty certificate
  • User manual / quick start guide
  • Monitoring app setup guide
  • Emergency procedures
  • Warranty registration details
Emergency contacts to save

Always save:

  • Installer emergency contact number
  • Manufacturer support hotline
  • Western Power faults: 13 13 51

In case of emergency:

  • Fire or smoke: call 000 and evacuate
  • Do not attempt to extinguish a battery fire
  • Turn off the solar isolator if safe to do so

This checklist covers general WA solar + battery installation requirements. Your specific installation may have additional requirements. Always follow your SAA-accredited installer's guidance.