Everything you need to prepare before, during, and after your battery installation. A smooth installation starts with proper preparation.
Confirm installation date and time window with installerImportant
Most installations take 4-8 hours depending on system complexity
Review and sign installation contract
Check warranty terms, payment schedule, and included work
Confirm Western Power connection approval (if required)Important
Your installer should handle this, but confirm it's been submitted
Check council permit status (if required for your area)
Most residential installations don't need permits, but check with your installer
Arrange time off work if installation is during business hours
Someone 18+ must be home during installation
Notify neighbors if installation requires street access
Especially if parking space needed for installation vehicle
Clear path to switchboard locationImportant
Installers need clear access to work safely
Clear area where battery will be mountedImportant
Battery needs clearance: 300mm sides, 600mm front for ventilation
Move vehicles from driveway if access needed
Installers may need to park close to installation location
Secure pets on installation day
Keep pets contained away from work area
Locate and test existing solar inverter (if applicable)
Note any error codes or issues to discuss with installer
Check your monitoring app credentials work
You'll want to monitor the new system immediately
Charge devices - power will be off for 1-2 hoursImportant
Laptop, phones, any essential devices
Check weather forecast
Heavy rain may delay installation - installer will contact you
Confirm installer arrival time
Get installer's mobile number for day-of contact
Prepare questions for installer
Write down any questions about operation, maintenance, monitoring
Set alarm for fridge/freezer
Move critical items to esky if power outage will be extended
Back up any scheduled recordings (PVR)
Power interruption may affect scheduled recordings
Be home to greet installer and confirm accessImportant
Show installer switchboard, proposed battery location, any concerns
Confirm final battery placement before mountingImportant
Once mounted, battery cannot easily be moved
Stay available for questions during installation
Installer may need to confirm cable routing or other decisions
Take photos of installation progress
Useful for warranty claims and your records
Note any issues or changes to original plan
Document any variations agreed during installation
Walk through system operation with installerImportant
Understand normal operation, indicators, and what to do if something seems wrong
Get monitoring app installed and connectedImportant
Installer should set this up and show you how to use it
Receive all documentation and certificatesImportant
Certificate of Compliance (CoC), warranty documents, manuals
Understand warranty registration requirements
Some manufacturers require registration within 30-90 days
Confirm Western Power notification has been submitted
Required for grid-connected systems
Get emergency contact details
Who to call for urgent issues vs routine questions
Make final payment as per contract terms
Only after satisfactory commissioning and documentation received
Monitor battery charging and discharging patterns
Normal: charges during solar hours, discharges in evening
Register warranty with manufacturerImportant
Required by most manufacturers to activate full warranty
Set up alerts in monitoring app
Get notified of any unusual behavior or errors
Test backup power (if applicable)
Some systems let you test blackout behavior safely
Note baseline energy usage patterns
Compare to your bills later to measure savings
Save all documentation securely
Digital copies in cloud storage, physical copies in safe place
Summer Installation
Schedule installations early morning during summer to avoid peak heat. Batteries should not be installed in direct afternoon sun locations.
Western Power Requirements
All grid-connected batteries must be registered with Western Power. Your installer handles this, but approval can take 2-4 weeks.
AS/NZS 5139 Compliance
All battery installations in Australia must comply with battery safety standards. Your installer must provide a Certificate of Compliance.
From Installer
From Manufacturer